Raft inspections LRU -25
- visual inspect every 6 months
- leak check 2.0psi
- 15 min stab
- 1hr leak test on boarding and support tube
- 2hr leak test on upper and lower tube
- 60 second to inflate fully on functional
- functional every 36 months or every 3rd leak test
- shop air 40psi
- after packing allow to sit min 1 hour max 72 hours
- leak test every 360 days
CGTO PG-85-00-310-A 2-31
Raft modifications and components
- inflation lanyard 12ft 10in+- 1in. MPC 256204.0 p. 9
- 75ft tether line. MPC 256204.0 p. 9
- 15ft type 3 survival bag retaining line
- 50ft sea anchor kept in 18in hanks
- retaining strap is a 3 part system: made up of a frangible link, short and long strap
- retro tape- 6 2x12in upper tube. 6 2x12in support tube. 3 2x9in boarding ramp
- canopy contains 18 (2x12in) pieces of retro
Raft bottle specs
- hydro date 3 years M13520.1C
- torque seal in 2 places: F900 swivel junction on Y-fitting and inflation valve bottle/body junction point.
- pressure in bottle 3160 psi+- 100psi at 70 F +- 5 F
- CO2- 2.5lbs in cyl. after it should be 2.2+- .01 lbs record weight
- fill nitrogen to 3300-3400psi do not exceed 3400psi
- after 3 hr cooling period 3160+- psi
M13520.1C 2-15,16
How much pull force is required to actuate the inflation valve both rafts
6-15 lbs
CGTO PG-85-00-310-A 2-32
What is the normal and overload capacities
Normal- 6 persons
Overload- 9 persons
M13520.1C 2-13
How many pounds of CO2 can pass through the purifier cartridges before they shall be replaced
250 lbs
M13520.1C 2-16
What are the normal and overload capacities for the LRU-33 raft
Normal- 20 persons
Overload- 30 persons
13520.1C 2-5
What do the C-130J and H use for wing installation cable assembly for the LRU-33
C-130J- left wing: red color code right wing: green
C-130H- left wing: red/white right wing:green/white
13520.1C 2-5
How much pull force is required to actuate the inflation valve
6-15 lbs
CGTO PG-85-00-310-A 2-32
What is the normal and overload capacities
Normal- 6 persons
Overload- 9 persons
M13520.1C 2-13
How many pounds of CO2 can pass through the purifier cartridges before they shall be replaced
250 lbs
M13520.1C 2-16
What do you cover up with black pen in the rectangle on the LRU 25 raft container
over load capacity 9 persons and rotary wing
MPC 256204.0 p. 7
What is a caution when removing the Liferaft from the container
Inadvertent inflation
MPC 256204.0 p. 7
What size wrench is used to unscrew the chain connector attached to the inflation lanyard
7 mm
MPC 256204.0 p. 8
What is wrapped on the inflation hose attachment points on the inflation assembly discharge y fitting
black electrical tape
MPC 256204.0 p. 8
What do you apply to the swivel junction point on the inflation assembly discharge Y fitting and the inflation valve bottle fitting/body junction point
Thin bead of Torque seal F-900
MPC 256204.0 p. 8
Where do you place the heaving ring for the LRU 25
On top of a Hank and on top of INFERIOR life line(blue color)
MPC 256204.0 p. 9
What do you apply to the lower half of the threads of the hand pump
Anaerobic single-component adhesive
Loctite 242 blue type 2
MPC 256204.0 p. 10
What do you tighten the topping off valve of the hand pump with
27 mm wrench
MPC 256204.0 p. 10
What do you attach to the survival items equipment retaining line
A locally manufactured streamer marked “tie to survival equipment bag” using a bowline
MPC 256204.0 p. 15
What do you secure the cylinder in while not attached to the life raft
Chain vise
MPC 256204.0 p. 8
How many inches of the survival equipment retaining line should be left in the survival equipment compartment
12 in
MPC 256204.0 p. 17
What can the shop air be regulated to temporarily to open the check valve in the inflation hose?
50 psig
MPC 256204.0 p. 26
What pressure should the opening pressure of the PRV valve not exceed
2.9 psi
MPC 256204.0 p. 26
What pressure should the PRV fully close
No less than 2.1 psi
MPC 256204.0 p. 26
How many times can a PRV fail and what must be done afterwards
After the 2nd failure return raft and inflation assembly condition code F to ALC
MPC 256204.0 p. 26
What tool is used to remove the PRV valve
Mirada valve, B-51025
MPC 256204.0 p. 27
There shall be no seam lifts over ___ on new rafts
3/16 in
MPC 256204.0 p. 29
What is the max air pressure for leak test and what is the min air pressure it can drop to
- 0 max
- 8 min
MPC 256204.0 p.28-30
What size on the vernier caliper should the battery thickness measure
0.438 in +- 0.010
MPC 256204.0 p. 30
What goes inside the 10 in food saver bag
4 repair plugs, pliers, and instruction card
Vacuum seal on setting 3
MPC 256204.0 p. 31
How do you wash the Life raft container
Shall not be machine washed
Use a solution of clear ivory brand detergent and water(1 oz to 1 gal of water), brush with soft bristle brush
MPC 256204.0 p. 33
Wha size crow foot is used to remove an inflation valve
1-1/8 in with a 6 in extension and ratchet
MPC 256204.0 p. 34
What do you lube the cylinder head o ring with
Dow Corning Molykote, DC-55M
MPC 256204.0 p. 36
What do you use to screw inflation assembly onto cylinder
1-1/8 in crow foot, 6 in extension with ratchet and torque to 252-276 in pound or 21-23 foot pounds
MPC 256204.0 p. 36
What aircrafts is the raft used on
65, 60, 25, 144
M13520.1C P 2-13
What is the hydro date intervals for the raft bottle
Hydro every 3 years M13520.1C p. 2-15
The cylinder shall have a service life of 3 hydrostatic tests or a life limit of 15 years from the date of manufacture, whichever comes first
MPC 256204.0 p 24
What is the breaking strength of the week link attaching the mooring/retention line to the liferaft webbing when equipped on the C-144A
300 lbs
CGTO 1C-144A-1 p 1-150
What is the volume of the LRU-33
86.3 cubic ft
M13520.1C p 2-5
What is the operating pressure of the LRU-33
1.5-3.6 psi
M13520.1C p 2-5
What color cable assembly does the C-130H use
Left wing- red/white color
Right wing- green/white color
M13520.1C p 2-5
What color cable assembly does the C-130J use
Left wing- red
Right wing- green
M13520.1C p 2-5
How many subsystems make up the LRU-33
5
M13520.1C p 2-5
What pressure will the LRU-33 bottle rupture disc rupture at
4500-4950 psi
M13520.1C p 2-7
What is the combination weight for the bottle of CO2 and nitrogen
CO2- 3.06 lbs
Nitrogen- 5.7 lbs
M13520.1C p 2-7
What is the volume of the LRU-25
26.8 cubic ft
M13520.1C p 2-13
What is the operating pressure of the LRU-25
1.3-4.7
M13520.1C p 2-13