Labor Equipment and Productivity Flashcards

1
Q

the amount of work produced; dollar value of work produced

A

productivity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

equation for productivity

A

units of output / input

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Machine used to dig up the ground; mounted on crawlers

A

Excavator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Machine designed to pick up loose material on the ground and load onto a truck

A

Loader; Front end loader

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

All purpose unit with small wheels; can be a dozer, spread material, load or haul material as well

A

Back Hoe

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Vehicle designed to move soil from location to location

A

Dumb Truck

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Term used to describe when the soil is to the rim of the dump truck

A

Struck Capacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Term used to describe when the soil is over the rim of the dump truck in a hill like fashion

A

heaped capacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Machine designed to scrape the earth

A

scraper

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Machine designed to level the ground

A

Bull Dozer/Grader

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Machine designed to vibrate material and compact it further; unit with a roller

A

Compactor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Breaks up tough soil

A

ripper

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Quantities for Earthwork include:

A
  1. ) Calculation of Earth Volumes
  2. ) Balancing cut and fill volumes
  3. ) Planning the most economical material haul routes
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How long is a station measured?

A

every 100 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Term used to describing the taking away of earth material

A

Cut

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Term used to describe putting back earth material

A

fill

17
Q

3 types of volume

A

Bank volume, loose volume, compacted volume

18
Q

How soil has increased between volume states

A

swell factor

19
Q

what kind of grid is more accurate?

A

smaller grid

20
Q

truck cycle time

A

Load, Haul, Dump, Return

21
Q

What characteristic must trucks have in order meet the capacity requirement?

A

4 to 5 times the capacity of escavator bucket

22
Q

Three components of Earthwork Pricing

A
  1. ) Determine the optimum number of trucks
  2. )Determine optimum number of dozers
  3. ) Determine the production rate of the spread