Cost Estimating Flashcards

1
Q

prepares cost estimates, the needed quantity of materials, labor, and equipment, and the time to complete a job

A

Construction Estimator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

to determine a probable cost of any given project before construction begins

A

estimating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

why is estimating important?

A

It helps companies prepare accurate costs prior to construction which can predict the best result for success

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

when does a company lose work?

A

When the bids are too high

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When does a company lose money?

A

When the bids are too low

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

what does the cost estimate represent? (3)

A
  1. ) a prediction based on the information known at the given time
  2. ) an approximation of the monetary resources needed to complete project activities
  3. ) a quantitative assessment of the likely costs for resources required to complete the activity
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How to measure the cost estimate accuracy?

A

(estimate - actual cost)/actual cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

types of estimates (5)

A

Conceptual planning,feasibility, engineering & design, construction, and change orders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When are historical unit prices used?

A

When the details of adequate design information cannot be reasonably assumed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

a labeling system that arranges project components into divisions with a number of subdivisions

A

Work Breakdown Structure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

process of using various factors to develop an estimate with limited information

A

Programmatic estimates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Factors that contribute to programmatic estimating

A

size, square feet, building type, foundation type

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How does historical data help estimates?

A

Must be adjusted for location, time, size and contingency in order to use it correctly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Chart of costs of materials that helps predict future costs based on the past

A

index

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

list of materials varying in 20 major US cities and 2 cities in canada

A

Engineering News Record Construction Cost Index

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Uses skilled labor instead of common labor, same as CCI

A

Building cost Index

17
Q

How to present the estimate

A

List all assumptions, construction costs only, no cost of land or demolition etc, present range if possible