Uniformat VS. Masterformat

A

Uniformat: Used by architects and engineers for planning and budgeting building elements.

Masterformat: Used by contractors and suppliers for organizing construction activities and documentation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

MASTERFORMATDIVIDED INTO __ DIVISIONS

A

50

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

WHY MASTERFORMAT SPEC IS NOT GOOD?

A

NOT SUITABLE TO TRACK COST CHANGES DURING THE DESIGN PHASE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

DIFFERENT TRADES INVOLVED 6 DIFFERENT TYPE OF CONSTRUCTION WORK

A

MASON

INTERIOR SYSTEMS

SPRAY INSULATION INSTALLER

STEEL LINTEL FABRICATOR & INSTALLER

PLASTERER

PAINTER

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

WHAT IF WE GO WITH
PREFAB CONCRETE INSTEAD
OF MASONRY? WHAT ARE
THE COST IMPLICATIONS?

A

AT AN EARLY STAGE IN THE PROJECT,
MASTERFORMAT GETS COMPLICATED!

  • CHANGING FROM ONE DECISION TO ANOTHER IS A BAD APPROACH WCH WHAT CONTRACTORS ARE SPECIALIZED IN DOING, THEY KEEP MODIFYING CHANGE OF WORKER OR WORK, AND CHANGE OF MATERIALS, ETC.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

THE SOLUTION TO MASTERFOMAT PROBLEM ISSUES?

A

DITCH MASTER FORMATUSE UNIFORMAT II

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

UNIFORMAT II IS COMPOSED OF 7 DIVISIONS, NAME THEM.
A-G = S.S.I.S.E.S.B

A

A SUBSTRUCTURE
B SHELL
C INTERIORS
D SERVICES
E EQUIPMENT AND FURNISHINGS
F SPECIAL CONSTRUCTION & DEMOLITION
G BUILDING SITEWORK

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

4 FUNCTIONS OF MASTERFORMAT

A
  • ORGANIZATIONAL SYSTEM
  • ARRANGES CONSTRUCTION
    INFORMATION FOR CONSTRUCTION
    CONTRACT DOCUMENTS
  • BREAKS A BUILDING DOWN INTO
    VERY SPECIFIC COMPONENTS
  • EXTREMELY CHALLENGING TO USE FOR
    EVALUATING DESIGN ALTERNATIVES
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

4 FUNCTIONS OF UNIFORMAT

A
  • ORGANIZATIONAL SYSTEM
  • ARRANGES CONSTRUCTION INFORMATION BASED ON FUNCTIONAL ELEMENTS
  • BREAKS A BUILDING DOWN INTO SYSTEMS AND ASSEMBLIES THAT PERFORM A SPECIFIC FUNCTION
  • ALLOWS FOR EASIER COMPARISON OF DESIGN ALTERNATIVES
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

6 ADVANTAGES OF ELEMENTAL DESIGN ESTIMATES
(L.MS+MONITORED_EASILY)

A
  • INCLUDE LABOUR, MATERIALS and SUBTRADE OVERHEAD/PROFIT
  • MORE EASILY UNDERSTOOD BY CLIENTS
  • COSTS CAN BE MONITORED FROM DESIGN TO C.D. PHASE
  • CHANGES CAN BE EASILY & QUICKLY EVALUATED
  • COST MONITORING IS EASIER THROUGHOUT DESIGN PROCESS
  • NO NEED TO UNSCRAMBLE MASTERFORMAT DIVISIONS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

3 THINGS RS MEANS ELEMENTAL PROVIDE?
F.E.F

A

PROVIDES COSTS WITH THE FOLLOWING INFO:

  1. FLOOR AREA
  2. EXTERIOR WALL CONSTRUCTION
  3. FRAMING SYSTEM
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

T OR F? RS MEANS HAS A SIMPLIFIED VERSION OF ELEMENTAL COST DATA?

A

T

How well did you know this?
1
Not at all
2
3
4
5
Perfectly