- The most important consideration in size up at vacant building fires is?
Select one:
a. Contents
b. Fire size
c. Structural stability
d. Life
life
- When a replacement KO Curtain is required, the company officer shall contact _________ for a replacement.
Select one:
a. Administrative Division
b. Research and Development
c. Administrative Battalion
d. Tech Services
The correct answer is: Administrative Division
- Which one of the following responses would not be considered a “Group 1” (one company assigned and responds in the 10-20 mode) response under the Modified Response Policy?
Select one:
a. Tree down, no wires, buildings or vehicles affected
b. ERS no contact (2300 to 0800 hours)
c. Water leak
d. BARS alarm
bars
- Units with Positive Pressure Fans (PPF) should start the fans weekly at MUD and allow the fans to run at full RPM for _________ minutes.
Select one:
a. 15
b. 20
c. 10
d. 5
5
h type cockloft as much as _ feet deep
4
t/f The trench should be cut at the narrowest available roof section, taking advantage of bulkhead structures, interior firewalls, skylights or bulkheads.
false do not rely on firewalls
Choose an incorrect answer regarding mutual exchanges of partial or full vacation periods.
Select one:
a. Not more than one application involving either member shall be made in one calendar year.
b. A 5th or 6th grade firefighter may exchange vacation only with another firefighter of either 5th or 6th grade.
c. All vacation periods shall begin and end at either 0900 or 1800 hours on dates specified in vacation schedules.
d. Mutual exchanges must be between full duty members currently working the two platoon system in field units
((Regs 17.7.11) All vacation periods shall begin and end at 0900 hours
The correct answer is: All vacation periods shall begin and end at either 0900 or 1800 hours on dates specified in vacation schedules.
The operation, shutdown or change of any building system shall not be done by the Systems Control Unit without the permission of the IC or which choice below?
Select one:
a. The Logistics Section Chief
b. The Safety Officer
c. The Fire Sector Supervisor
d. The Operations Section Chief
(ICS Chap.2 Add 6 4.2)
The correct answer is: The Operations Section Chief
Company commanders shall determine special needs for winter operations and requisition or obtain such supplies and equipment in advance of winter weather. Requisitioning shall commence on what date to permit sufficient time for materials to be delivered?
Select one:
a. September 1st
b. July 1st
c. August 1st
d. October 1st
july first
Drills and training schedules concerning winter operations shall be initiated during which month each year?
Select one:
a. November
b. October
c. September
d. August
october
how much is high pressure pumping?
what floor requires third stagepumping?
what floor is preferred choice for third stage pumping?
over 250
pressures exceeding 600 floor 101-110
pressures over 500 81-90