Incsys LMS Flashcards

1
Q

What is ELi the iCe Man?

A

For a Reactor (L), the voltage E leads the current I

For a Capacitor (C), the Current I leads the voltage E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the highest transmission voltage in the United States today?

A

765 kV

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

In regards to state standards, what is RPS?

A

Renewable Portfolio Standards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

In the United States, there is roughly _________ gigawatts of load.

A

1000

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

CPS 1 is based on….

A

Minute-by-minute calculations based on a control area’s ACE and interconnection frequency.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

CPS 2 is based on…

A

10-minute averages of ACE to detect and penalize prolonged periods control area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

In regards to NERC Standards, CPS refers to ____________.

A

Control Performance Standard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Since CPS 1 is a rolling average value…

A

BA’s can make up for lost generation over time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A BA may elect to fulfill its contingency reserve obligations by participating in a _____________

A

Reserve sharing group

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

In ERCOT, time error correction is initiated when the clock is fast or slow by ________ seconds.

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

In the East, time error correction is initiated when the clock is fast or slow by __________ seconds.

A

10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

In the West, time error correction is initiated when the clock is fast or slow by ________ seconds.

A

5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The BA must review probable contingencies at least _________.

A

Annually

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The BA or RSG provides a DCS report to its Regional Reliability Organization…

A

Every quarter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Time error is corrected by…

A

Scheduling a frequency change

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When fixing a time error, a 0.2 change in Hz for one hour will result in…

A

1.2 seconds of correction

17
Q

What are cases where a governor will not actually respond?

A

At capacity limit
Minor deviations in frequency
Governor is blocked
Large dead band setting

18
Q

The term that describes a governor continuously adjusting the MW output to hold a frequency set point is known as as….

A

Isochronous mode

19
Q

What is the purpose of the governor?

A

Maintain shaft speed of a turbine
Direct the throttle valve to open in a low-frequency condition

20
Q

If reactance on all parallel paths are equal, then the Power Transfer Distribution Factors will be…

A

Equal

21
Q

PTDF’s can be used again when…

A

The system configuration has not changed

22
Q

PTDF’s should be recalculated when…

A

A line has been removed from service.

23
Q

The total reactance of a path is the ____________ of the reactance for each length.

A

Sum

24
Q

When observing a flow over parallel lines, you would expect a lower voltage line to have a _____________ Power Transfer Distribution Factor.

A

Lower

25
Q

Does GSF change when a line goes out of service?

A

Yes

26
Q

If a TO enters an unknown operating state, it will be considered to be in an emergency and shall restore operations to respect proven reliability power system limits within ______________.

A

30 minutes

27
Q

You have flow along Line A that is nearing its thermal rating. To reduce loading on Line A you should ________ generation at the sending end and _______________ generation at the receiving end.

A

Reduce/Increase

28
Q

Operators can use LODF’s as an alternative to ________________ which may not be available.

A

Full AC contingency analysis

29
Q

A 5% change in a customer’s service voltage will typically lead to what change in the customer’s load magnitude?

A

3%

30
Q

AGC may be suspended if continued control would result in generation changes that could damage equipment at frequency deviations of how many Hz?

A

+ or - 0.2 Hz