Important Systems Flashcards
How long are the 250 VDC Plant Batteries expected to last during a Loss of Off-site Power?
3 hours
How long are the 250 VDC Plant Batteries expected to last during a Station Blackout?
4 hours
If the CRID is being powered from CRP-3, what’s the status of the CRID Bus?
Inoperable
What are the bus and Trains for the CRIDs?
CRID 1 - C
CRID 2 - D
CRID 3 - A
CRID 4 - B
What does it mean when the NSYNC Light goes out?
The alt source of power is gone
What is the normal power supply to the CRIDs?
250 V DC
What are the autostarts for the MDAFPs?
Both MFPs Trip (w control switch in auto)
AMSAC
Loadshed
Lo-Lo SG Level (1 SG)
SI
What are the TDAFP Auto Stared?
Undervoltage on RCP Bus
SG Lo-Lo (2 SGs)
AMSAC
What does the AMSAC Signal do?
Trips the Turbine and Starts all AFW pumps
What is the TS Minimum and Basis of the CST?
182,000 gals (44%)
Maintains plant in hot standby for 9 hours onPORVs w LOOP
What are the 3 autostarts of the CCW Pumps?
SI
Loadshed
Low discharge pressure (80#)
What does a high rad signal do for CCW?
Auto closes surge tank vent valve CRV-412
On an SI, what flow do the RHR Hx CCW Outlet valves throttle to?
3000-3500 gpm
What CCW Systems isolate on a Phase A?
SFP Hx
Excess LD
Rx Support Cooler
NBAE
What are the ESF Loads for CCS?
RHR Hx RHR pp Seal Hx CTS pp Seal Hx SI pp LO SI pp Seal Hx CCP LO Cooler CCP Speed Increaser
Does the control air compressor have a loadshed trip?
No
What are the key pressures of the plant and control air systems?
100 # - Normal
95# - Standy PAC Stars
90# - CAC Starts (sensed in wet air receiver)
85# - PA Hdr Isolation Valves Close
80# - Manual Trip
Which Rad monitors will close the 100 series valves (inside containment) and trip the IR Purge supply fan?
Train A 00 Odd Rad Monitors (ex: 1300)
Which Rad Monitors will close the 200 series valves (outside containment) and trip the majority of the ventilation supply fans?
Train B- Even Rad Monitors (Ex: 1400)
What are the Tech Spec Limits for upper and Lower Containment?
Upper: 60-100*F
Lower: 60-120*F
What are the Tech Spec Pressure limits for containment? And what must be done if outside limits?
- 1.5 to +0.3 psig
* Restore within limits within 1 hour
What signal stats the CTS Pumps?
Phase B
What signal opens the CTS Pump Discharge valves and the SAT Outlet Valves?
CTS Signal
What are the key levels and associated actions of QLC-451 for the VCT?
2.5% - Low-Low Alarm and half RWS signal
14% - Auto Makeup Starts + Low Alarm + MU Not in Auto Alarm
24% - Auto Makeup Stops
87% - Divert Trips Open + High Alarm