IBrid Field Test Flashcards
What is the purpose of field testing the iBrid?
To ensure its proper operation
Field testing is crucial for functionality and safety before deployment.
List the first step in field testing the iBrid.
Remove the device from its charging station and turn it on
The initial step is essential to begin the testing process.
What should be observed during the startup self-test of the iBrid?
Audible, visible, and vibrating alarms
These alarms indicate the operational status of the device.
What must be checked for after the startup self-test?
A full battery charge
Ensuring a full battery is critical for operational readiness.
What is the fifth step in the iBrid field testing process?
View and clear peaks
This step helps in assessing the device’s previous readings.
What must be done if the iBrid fails any stage of the field test?
It cannot be used and must be removed from service until repaired
Safety protocols require non-functional devices to be serviced before use.
How should the iBrid be operated after field testing?
Continuously while in the field
Continuous operation is necessary for effective monitoring.
Fill in the blank: The iBrid can be attached to a person or _______.
[equipment]
This flexibility allows for various use cases in the field.
What should be done with the results of the iBrid field test?
Report results to the Captain
Reporting ensures accountability and oversight.
What is the last step in the iBrid field testing procedure?
Leave the device on
Keeping the device powered is essential for ongoing monitoring.
What must be performed before using the iBrid?
Field test
This ensures proper operation before deployment.
What is the first step in the iBrid field test?
Remove the device from its charging station and turn it on
This initiates the testing process.
What should be observed during the startup of the iBrid?
Self-test of the audible, visible and vibrating alarms
Ensures all alarm systems are functioning correctly.
What must be checked for during the field test?
Full battery charge
A full charge is necessary for operation.
What calibration must be performed during the field test?
Calibration of the iBrid
This is essential for accurate readings.