I Questions Flashcards

1
Q

What is a theodolight?

A

Optical instrument used to measures angles in the horizontal and vertical planes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is a hygrometer?

A

Used to measure the amount of humidity in the air and diagnose condensation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is an anemometer?

A

Used to measure the air movement within buildings to establish ventilation requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What precautions would you take to inspect a flat roof with a step ladder on your own?

A

Prepare RAMS before the survey., ladder must be capable of being placed at 70 degrees and allow inspection without standing on the last four rungs of the ladder.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Are you aware of any RICS guidance on undertaking inspections?

A

RICS Guide to Surveying Safely

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the requirements of the differing types of inspection?

A

The RICS provide a practice note ‘RICS Building Survey Practice Note’ advising on the mandatory components for undertaking a Survey.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What do you consider before attending site?

A

Competency, Insurance, Appointment, Risk assessment & method statement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When taking instruction from a client to undertake a survey, what info do you ask from them?

A

Details of any known risk, asbestos records, floor plans, etc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What would you look at when undertaking a desktop survey prior to inspection of a property?

A

Any hazards (Roofs, condition etc), closest pay phone, risk assesment, any info abut the location like radon etc.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How would you go about undertaking a building survey from the point of appointment?

A

3 Phases -
Phase 1 - Pre-inspection: Agree appointment, T&C’s, Client brief, Risk assessment, desktop research
Phase 2 - Inspection: Methodical inspection of the site incl. internals, extenals and wider site
Phase 3 - Report: Prepare report in line with RICS guidance and agreed scope with client.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the difference between a condition survey and a PPM survey?

A

Condition survey identifies the condition on that day. PPM identifies the condition and maintenance req. over a period of time (For example a 10 year PPM)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How would you undertake a schedule of condition in relation to party wall matters?

A

Would be a photographic shedule with each photo labelled

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the typical causes of black spot mould?

A

Condensation - Drying clothing indoors, breathing, poor ventilation etc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is interstitial condensation?

A

When warm, moist air moves through elements of the building fabric. Typically occurs in roof, wall or floor elements, those elements ‘out of view’.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How would you undertake a measured survey?

A

Carried out room by room, measuring at an agreed height typically 1.5m from FFL. Take FCH and identify the building elements and locations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is Net internal Area?

A

Usable area within a building measured to the internal face of the perimeter walls at each floor level. Excludes columns, stairs, struc columns etc

17
Q

What is Gross internal Area?

A

Internal floor area meausred to internal face of walls.

18
Q

What document/report would you use to advise the client on a scheme at RIBA Stage 0-1 and what information would you typically include?

A

Feasability report - Would include options for how the works could be carried out, statutory implications, budget, initial site appraisals, procurement options, assessment of exist info etc.

19
Q

How would interpret and provide advice in relation to results of advanced inspections by others?

A

Could simplify in reporting for client, clearly stating it has been produced by a 3rd party.

20
Q

Give me a few examples of inspections you’re aware of? Talk me through how the examples you gave differ?

A

PPM, TDD, Condition, SoC, snagging, EOD etc

21
Q

How did you agree the SoC report contents and format with your client and heritage consultant?

A

It was agreed by providing a redacted example which was discussed over a call. This was clarified within the fee proposal and PO.

22
Q

Talk me through what tools you took with you to 13 Baldwin Crescent and how you captured your survey data? How was this transcribed into a report?

A

Disto, moisture meter, camera, ipad and tape measure. Data was captured using a digital tool to record notes and photographs. Report was then drafted once back in the office.

23
Q

Advantages and disadvantages of traditional note taking vs digital data capture?

A

Digital tools can assist you with working methodically to an agreed format with less time required when you are back in the offie. Digital tools can however take more time on site and can be restrictive when specialist items arent pre-installed to the system.

24
Q

What is a snagging inspection? How did you go about completing it? How did you assess quality?

A

Identifies areas of works which arent finished to the agreed standards or where defects are evident. Should be reviewed against the agreed specification, manufacturers literature and works sections.

25
Q

How do you assess progress on site?

A

Assessed against the contractors agreed programme with a dropline on where progress should be.

26
Q

Why did you advise a PPM as the most appropriate form of survey? How did you determine the PPM timescale to report against?

A

This was agreed with the client based on their requirenemnts and breif. Ime period was agreed based on their portfolio financing req.

27
Q

How do you assess building component maintenance reigime over the PPM timespan?

A

Assessed based on known lifespans of each building element

28
Q

Why was a specialist required to undertake the inspection? How did you ensure they were competent to fulfil the role?

A

CCTV drainage is a specialist survey which is carried out by a specialist with the correct equiptment. A review of their isurances, past work and qualifications was undertaken.

29
Q

Why is it important to identify the condition of original and more recent additions when commissioning a heritage impact assessment?

A

To understand the interaction between them and the impact newer elements may have on those more historic elements.

30
Q

Are you aware of Deansgate disorder?

A

This is the same as regents street disease. It is where the steel frame is encased with facing stone. When the steel corrodes it expands resulting in cracking to the stone.

Cathodic protection can be used to help stop the corrosion.

31
Q

What other information would they require to prepare their heritage impact assessment?

A

Historic photos, relevent information on site, existing and proposed info

32
Q

Why does whether something is original or more recent matter for a heritage impact assesment?

A

The impact on altering a modern element is likely less than if the building is historic.

33
Q

How did you determine budget costs for the various elements on the Seante PPM?

A

They were costed using rates from BCIS and benchmarking. Costed by QS.

34
Q

How did you determine lifecycle/remaining lifespan on the PPM? How were items with a lifespan exceeding 5 years accounted for?

A

Against known lifespans and condition of the product. In line with ‘RICS Planned Preventative Maintenance of Commercial and Residential Property’ Professional Standard.
General commentary was captured for any items outside of the 5 years.

35
Q

Are there any other situations you are aware of where a schedule of condition may be required?

A

Party wall notice and schedule of dilapidations

36
Q

How did you set the condition grading for the PPM survey, in particular to Mechanical & Electrical elements? And What guidance did you review in order to support the allocation of tasks over the 5 year PPM?

A
  • Graded based on priority and condition
  • Based on evidence, O&M, commisioning data, servicing history, visual inspection and BCIS component life data.
  • Consider specific location and use factors that may influence the building element’s performance over a given time period
37
Q

What happens if a Contractor doesn’t rectify snags picked up on a snag report?

A

Give them all opportunities to repair. If no luck then others may be employed to rectify the defects, and the cost of such works deducted from the contractor’s retention.