HOSE TESTING Flashcards
Pages 85
1
Q
Hose testing is required ____ to detect problems before and prevent failure while operating on scene. After testing ensure all hoses is cleaned before reloading. Ensure _____ are in place and ensure ____ operate freely.
A
Annually
Gaskets
Swivels
2
Q
Fire hose shall be tested between ____ and ____. Before testing make arrangements with your District Chief and FRCC
A
March 15 and April 15
3
Q
Shall we tested at a pressure of 200 psi for five minutes continuous
A
5” and 6” hose
4
Q
Shall be tested per the marked service test pressure ( per NFPA 1962) for five minutes continuously. If the service pressure is not indicated, test at 250 psi for five minutes continuous.
A
3” hose or less