H&S Flashcards
What is primary legislation for H&S
Health and Safety at Work 1974
. Responsibilities on employers to look after employees as far as is reasonably possible
. On employees to follow rules, look after themselves and those impacted by their work
What is H&S at work 1974
Responsibilities on employers to look after employees as far as is reasonably possible
. On employees to follow rules, look after themselves and those impacted by their work
What is CDM 2015
Construction Design Management.
. Responsibility on dutyholders within a project
5 sections
1. Intro
2.Client Duty
3.PD and PC duty
4.General H&S reqs for all sites incl . structures, excavations, vehicle movements, emergency procedures
5. general
5 Sections of CDM 2015
- Intro
2.Client Duty
3.PD and PC duty
4.General H&S reqs for all sites incl . structures, excavations, vehicle movements, emergency procedures - general
Diff duties placed by CDM 2015
Client
.appoint PD and PC
. Encourage and provide resource for H&S
. Provide welfare (direct or indirect)
. F10 notification (online form to HSE, 30+ days of 20+ workers or 500+ working days
PD.
.Manage H&S in pre-con
.Inform client of duties
. check designers suitable for role
. risk management
. Prep H&S file
PC.
.H&S during construction
.Prep and maintain H&S file: (risks and mitigation, fire strat, access egress, RAMS)
. Liaise w client re H&S risks
. train and induct operatives
CDM role of client
appoint PD and PC
. Encourage and provide resource for H&S
. Provide welfare (direct or indirect)
. F10 notification (online form to HSE, 30+ days of 20+ workers or 500+ working days
CDM role of PD
.Manage H&S in pre-con
.Inform client of duties
. check designers suitable for role
. risk management
. Prep H&S file
During construction:
. provide pre-con info allowing construction phase plan and H&S file
. Assess changes w regards to H&S
CDM role of PC
.H&S during construction
.Prep and maintain H&S file: (risks and mitigation, fire strat, access egress, RAMS)
. Liaise w client re H&S risks
. train and induct operatives
What if no PD
client takes responsibilities
What is construction phase plan
.live doc
.explains H&S concerns and procedures
.Project description & key individuals
. Management of works (site rules)
. Emergency procedures
. Risks and mitigations
What does construciton phase plan include
.Project description & key individuals
. Management of works (site rules)
. Emergency procedures
. Risks and mitigations
What is H&S file
. Dictates how building will be used safely
.Not req. until completion, collated throughout construction process
. Overview
. H&S risks and management (residual risks, dangerous materials)
. Structural and service info (as builts, specs, load bearing info)
. O&M info (fire safety, access routes for maintenance, maintenance schedules, manuals).
. H&S for future works
. Record of changes and inspection
Key H&S legilsation
. H&S at Work 1974
. CDM 2015
. RIDDOR (Reporting of Injuries, Disease and Dangerous Occurrences Regs)
. COSHH (Control of Substances Hazardous to Human Health)
What does COSHH do
Control of Substances hazardous to human health
. prevent and mitigate risks with hazardous substances
. Data sheets, fact sheets which are kept with the substance showing how to be handled, protocol for emergency etc
. Should take measures against, ie: PPE, training, Storage
example relating to COSHH
Site visit, unlocked COSHH locker, notify site manager, asked if sorted, checked next time i was there
What is RIDDOR
Reporting of injuries, disease or dangerous occurrence, regs (2013)
In juries which keep people off for 3 days or off usual duties for 7 days - report to HSE
.some must be reported regardless - fractures, burns etc
What is HSE
Health and Safety Exec, independent watchdog to reduce work-related injury
Gov agency w regulatory power
Can visit and close sites without warning
.offer advice
.issue notice of contravention
.issue improvement notices
. issue prohibition notices.
. prosecute
What are permits
Formal system for risky activities (or depending on who’s site it is)
.working at height
.lone working
.excavation
.electrical
.confined space
CSCS
Construction skills certificate scheme
. short test
. Increase knowledge, reduce incidents
. Not legal req but most contractors req.
PM role in H&S
. No legal role under CDM, but perhaps under appt
. protect client, ensuring they are aware of reqs
. consider key risks
. manage our own competence
RICS guidance on H&S?
‘Surveying safely’
.Responsible for knowing H&S risks appropriate to their role
. Risk assess, emergency evac procedures, Consider building condition
‘Working at height’
Asbestos regs/prevention?
Asbestos Regs 2012
. Asbestos work requires specialist contractors if:
. High intensity
.Asbestos coating or lagging
. Above control limit of 0.1cm cubed per 1cm cubed
.Asbestos survey
.Asbestos management plan
.Asbestos specialists
. Asbestos register