Grading And Earthwork Flashcards
A : Finished Grade
B : Surfacing Material
C : Base Sub-Base
D : Compacted Subgrade
E : Undisturbed Subgrade
Of a cut or fill scenario, which is more structurally stable
Cut
Volume method for cut and fill that typically overestimates volumes
Average End Method
Benefits of Low impact development practices
When siting infiltration facilities, what considerations should be kept in mind?
Infiltration systems (pg 161 - 164) Site engineering for Landscape Architects
Section 330 Timesavers
Purpose of a backflow preventer
Used to protect potable water supplies from contamination or pollution due to backflow from the the irrigation systems into the potable water supply
What piece of the irrigation system does this show?
Backflow preventor
Difference between intensive and extensive green roofs
Intensive green roofs are typically over 6” of soil and more intensive plantings (trees, etc) while extensive green roofs are more often 1.6 - 6” of soil with plants like sedum and grasses.
Term for sizing that is rounded up to the nearest whole inch. What is this sizing typically used for
Nominal Sizing / Lumber
vegetative swales should be designed for what capacity
25 year design storm
complex grading projects typically use what method to calculate cut and fill quantities
Borrow Pit
The Rational Method of Calculation of Peak Stormwater Runoff Rates is typically used for which of the following sites?
Site under 200 acres in size