Generic Traction/ Comeng Flashcards
What is the Entry speed into a platform ?
55km
What is the Dead end platform speed ?
25km
How should PA announcement be like?
Clear
Concise
Provides information
Not to Brief
What power does the VICERS system run on ?
110v DC
Where is the VICERS system active ?
Only in a activated CAB only
What are the two sub-units of VICERS?
Vigilance control System
Event Recording System
The Vigilance Control System consists of?
Task linking of Driver Controls
Vigilance Acknowledgement Button
Vigilance Audible Buzzer
Vigilance Fault Indicator
Vigilance Activation Valve/ relay
The Event Recording system on VICERS incorporates what?
VM40 Event Recorder
Roof Mounted GPS antenna
What is the information order of a PA announcement?
Time of delay
Whats happened/why
Action or Alternative plans
Apology
What are included on Automatic Announcements?
-Junction station information
-Destination and express running conditions
-Terminal stations information
-Platform arrival Information
What are the steps for a FULL cab unattended procedure?
Advise passengers
Secure the train
Exit and secure the cab
Take portable Train Radio
Preform required duties
Return to CAB
What are the steps for a Unattended Modified cab Procedure ?
Advise passengers
Secure the train
Turn DTRS volume up
Exit the Cab
Perform necessary Duties
Return to CAB
What are the 3 Preparation Types?
Post maintenance Preparation
Mainline Train Preparation
Revenue/Pre-movement
What Information is Required when Docking a Train ?
Location of Yard/siding
Siding Number
Dock Time
TD number
Motor Number
Post maintenance Preparation
What Equipment must be carried during a Preparation?
Metro issued Mobile Phone
All drivers Keys
TMM Book
Torch
All appropriate PPE
What is the time allowance for a Pre- Departure preparation on all the trains ?
3 minutes
What are the allocated time for a Post Maintenance Preparation?
HCMT = Not Applicable
Six car set = 60 minutes C,S,X
Three Car Set = 30 minutes ( C,S,X)
What is the Allocated time for a MAINLINE preparation?
HCMT = 40 minutes
Six Car = 37 minutes C,S,X
Three car = 20 minutes
What is the Allocated time for a Pre - Movement / Revenue Preparation?
HCMT = 20 minutes
Six car set = 18 minutes C,S,X
Three Car set = 10 minutes C,S,X
When is a Mainline Preparation required?
Is required prior to the train entering the mainline or revenue service for the FIRST time each day
When is a Post Maintenance Preparation required?
-After a full scheduled maintenance exam in the workshop
-Undergoing major repairs
-Safety critical equipment or brake failure repairs
When is a Pre-Movement/Revenue Preparation required ?
-Prior to the train entering the mainline after it had already received a Post maintenance or Mainline preparation that day
-Where the train movements are limited with the yard or travelling from Melbourne yard to North Melbourne wash
What are the 4 Positions of the Reverser?
OFF
FORWARD
NEUTRAL
REVERSE
What are the operating Positions or notches or the Master Controller?
0 = OFF
1= SHUNT
2= SERIES
3= SERIES - PARALLEL
4 = WEAK FIELDS