In case of kick off plug if more than 90% of the plug has been drilled out without enough c
Stop, and set another plug
Some reasons to do a cement plug are
all choices except well control
Balanced plug tech is used to
minimize contamination
Contamination of cement slurry with mud will result in
Less compressive strength
Usually whipstock plug has higher slurry density
Achieve early development of compressive strength
In which type of plug early compressive strength is considered the main property of the cmt
kick of plug
The compatibility test is performed to determine.
The effect of mud or spacer contamination on slurry and set cement properties.
Which of the following are techniques to place a cement plug
Coiled tubing
Dump bailer
Balanced plug
Every country has its own governing regulations concerning well abandonment
True
Select the benefits of using stinger to place cement
- To prevent slurry disturbance,
- To protect drill pipe from cementing,
- To break pipe at stinger in case of pipe stuck) (all answers
What would you recommendation for the setting of the plug in OH on top of light mud
To spot the high viscosity pills below to prevent slurry sinking
Why is it recommended to have diverter on end of pipe
Minimize jetting effect