FS Testing (general)2 Flashcards

1
Q

Which module would you input slurry designs into

A

placement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Choose three principal reasons for prim cement job

A

1 Provides casing support and protection
2 Zonal isolation
3 Support axial load of casing strings and strings to run later

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

From the list below choose the five main types of casing string

A

Conductor, Surface, Intermediate, Production, Liner.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

After bumping the top plug on a 9 5/8 primary casing job when you bleed off pressure returns

A

Floating equipment failed, pump back until plug bumps, bleed off rapidly, and observe returns again. Repeat twice, if returns still do not stop, hold minimum pressure until cement sets.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the top out cement job operation

A

Cement job performed till cement to surface.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Purpose of conductor casing

A

Prevent washing out under the rig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Purpose of surface casing

A

Protect surface fresh water formation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Intermediate casing is run to

A

Isolate hole into workable sections

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Production casing will

A

Isolates the pay zone from other formations and the fluids in them.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What does CemCAT mean

A

Cementing Computer Aided Treatment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Drilling mud used for

A

Provide primary well control
Cool down the bit
Support borehole

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are key parameters you should know about any working string (Casing, Drill pipe & HV

A

OD
Weight
Grade
Length

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Select the reason for using the bottom plug in primary cementing

A

Separates cement from cw/spacer/mud to avoid contamination

It wipes the drilling fluid layer from the inside of a casing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Select the reason for using the bottom plug in primary cementing

A

Separates cement from cw/spacer/mud to avoid contamination

It wipes the drilling fluid layer from the inside of a casing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Give 2 reasons for using Top plug in primary cementing…

A

1 Positive indication of end of displacement.

2 Separates cement from displacement fluid to avoid contamination.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How do you differentiate a bottom plug from top plug

A

Bottom plug is hollow inside, not solid

17
Q

What are the 2 main families of raw materials used to manufacture cement

A

Calcareous - 2 parts, Argillaceous – 1 part or limestone and clay

18
Q

What mineral is added to the clinker during the final grinding phase of the cement manufacturing

19
Q

Why is gypsum added

A

prevent cement from flash setting

20
Q

What is HSR cement

A

High sulfate resistant