FR-S.1, S.2 Flashcards
FR-S.1
When initially checking L s/g if < 15% what AFW flowrate do you maintain?
Why?
> 850 gpm
You are not just removing decay heat you are removing heat from power operation OR return to criticality
FR-S.1
Why do you check Ppzr < 2335 psig?
- to alert the operator if Prcs is high enough to prohibit isuficient charging injection and therefore BORATION
FR-S.1
If the turbine does not trip on the second step of FR-S.1 what action do you take?
What do you do if that action does not work?
Why are you tripping the turbine in the first place during and ATWS?
- ramp turbine 2400 MW/min
- shut MSIVs and byps
- normally tripped to prevent uncontrolled RCS c/d
- (ATWS loss of FW event) the turbine is tripped to maintain inventory and limit the RCS pressure spike
FR-S.1
you are in FR-S.1 with:
Pwr =6%
ECCS pmps injecting
Prcs = 1200 psig
Will you secure RCPs?
No
If power > 5%, you will not secure rcps. ECCS can only remove decay heat not operation heat
Also, securing RCPs w/in TCOA is per design base analysis. ATWS event is beyond design basis
FR-S.1
If responding to an ATWS
- trip bkrs are not open
- rods are not in core (but being driven in)
- power = 3% and lowering
……….upon reaching point in the procedure to address other procedures (i.e. FR-H.1), can you transition out of FR-S.1?
If yes, are there any conditions that would not allow you to transition out of FR-S.1?
YES, you can transition out of FR-S.1
If you still have active red path for criticality
(PR > 5%)
OR
(IR SUR +)
you cannot transition out of FR-S.1 but you are instructed to perform other FR procedures in effect