E-0 (Rx trip) Flashcards
1
Q
E-0
What are the SI termination criteria?
A
- Subcooling (CET) > 20 deg F
- Heat sink ( > 15% NR L s/g or 435 gpm AFW)
- Prcs - stable or rising
- Lpzr > 12%
2
Q
E-0
What are the procedures that you can transition to from “Rx Trip”?
A
- FR-S.1, ATWS (s 1, rx not tripped)
- E-0.1, Rx trip response (s 4, no SI)
- E-1, LOCA (s 7, PORV/ Safety stuck)
- s 11, diag
- s 28, Prcs < 300 psig
- s 29, Prcs < 300 psig
- E-2, Fault S/G (s 9, diag)
- E-3, Rupt S/G (s 10, diag)
- s 25, S/G act norm
- E-1.2, Pst LOCA c/d (s 15, Prcs lowering)
- s 18, Lpzr lowering
- ECA-1.2 LOCA outsd cnmt (s 26, Aux Rad mon)
- E-1.1, SI Termination (s 19, post diag)
3
Q
E-0
What actions do you take in E-0 if you have ……
no vital 4 kv busses energized?
one vital 4 kv bus energized?
two vital 4 kv buses energized?
A
0 - go to ECA-0.0
1 - impliment ECA-0.3
2 - refer to ECA-0.3 while continueing
4
Q
E-0
What parameters do you check to determine if…..
Fautled S/G
Ruptured S/G
Intact RCS
A
E-2
- P s/g not lowering in uncontrolled manner
- no S/G completely depressurized
E-3
- RM 15/15R, 71-74, 19 no upward trends or spikes
- SJAE, S/G B/D, Mn stm Hi Rad Pks out
- L s/g not rising in uncontrolled manner
E-1
- Pcnmt normal
- L cnmt smp normal
- cnmt Rad normal
5
Q
E-0
What are the conditions for adverse CNMT?
What is RCP trip criteria?
What actions do you take if Phase B actuates?
A
- Pcnmt > 3 psig
- Cnmt Rad > 105 R/hr
- Cnmt dose > 106 R
- Prcs < 1300 psig
- at least one ECCS CCP or SI running
- maintain seal inj, 8-13 gpm
- ensure spray actuates
- trip RCPs w/in 5 min
- align vlvs if nec (white lights)
- maintain seal inj, 8-13 gpm