E-1.1 (SI Termination) Flashcards
1
Q
E-1.1
What is the SI reinitiation criteria?
If criteria met, how is SI reinitiated?
A
- RCS subcooling < 20 deg F
- Lpzr not maintain > 12%
- manually start ECCS pumps as neccesary
- if start CCP, align injection
- Go to E-1
2
Q
E-1.1
What parameter(s) must be met after SI is reset to secure the SI pumps?
RHR pumps?
A
- Prcs - stable or rising
- Prcs > 1650 psig
- No SI flow
- any RHR pump running aligned to RWST
3
Q
E-1.1
What are the different procedures that you can transition to from SI Termination?
A
- E-1.2, Post LOCA c/d (s 3, Prcs lowering)
- s 6, Lpzr lowering
- s 7, Prcs lowering
- E-1, LOCA (s 9, subcooling < 20 deg F)
- s 9, Lpzr < 12%
- s 32, subcooling/ Lpzr
- E-0.2, end of proc
- L-7, end of proc
- L-5, end of proc
4
Q
E-1.1
What criteria must be met to secure Cnmt Spray (if actuated) in SI term procedure?
A
- Cnmt Rad monitors NORMAL
- RM-2
- RM-7
- RM-30/31
- PK, Hi Rad & CNMT RAD off
- Pcnmt < 20 psig