E-1.1

What is the SI reinitiation criteria?

If criteria met, how is SI reinitiated?

A
  • RCS subcooling < 20 deg F
  • Lpzr not maintain > 12%
  • manually start ECCS pumps as neccesary
    • if start CCP, align injection
  • Go to E-1
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

E-1.1

What parameter(s) must be met after SI is reset to secure the SI pumps?

RHR pumps?

A
  • Prcs - stable or rising
  • Prcs > 1650 psig
  • No SI flow
  • any RHR pump running aligned to RWST
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

E-1.1

What are the different procedures that you can transition to from SI Termination?

A
  • E-1.2, Post LOCA c/d (s 3, Prcs lowering)
    • s 6, Lpzr lowering
    • s 7, Prcs lowering
  • E-1, LOCA (s 9, subcooling < 20 deg F)
    • s 9, Lpzr < 12%
    • s 32, subcooling/ Lpzr
  • E-0.2, end of proc
  • L-7, end of proc
  • L-5, end of proc
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

E-1.1

What criteria must be met to secure Cnmt Spray (if actuated) in SI term procedure?

A
  • Cnmt Rad monitors NORMAL
    • RM-2
    • RM-7
    • RM-30/31
    • PK, Hi Rad & CNMT RAD off
  • Pcnmt < 20 psig