Estimating cost Flashcards

1
Q

Name 3 types of top down cost estimates

A

Analogy, expert opinion and parametric.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Name one bottom down cost estimate

A

Cost engineering

-Detailed breakdown of labour or materials at the work package or task level.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Name 7 sources of cost overruns.

A
  1. Uncertainty and lack of information
  2. Changes in requirements or design
  3. Economic/Social Factors
  4. Inefficiency, Poor communication and lack of control
  5. Ego of the estimator
  6. Project contract
  7. Bias and ambition
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Whats are life cycle costs?

A

All costs of a system incurred during each phase of the project life cycle from the conception phase to the operations phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is an estimate?

A

A realistic assessment based upon facts about the work, required resources, constraints and the
environment, derived from estimating methods.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the difference between accuracy and precision.

A

Accuracy is the closeness of the estimated value to the actual value.

Precision is how many decimal places are used in the estimate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Name 4 types of costs

A

Direct costs
Direct Overhead Costs
General & Admin overhead costs
Profits

How well did you know this?
1
Not at all
2
3
4
5
Perfectly