EPRI CHAPTER 4 Flashcards

1
Q

ACCORDING TO THE LOAD/FREQ. RELATIONSHIP A 1% CHANGE IN FREQ. WILL LEAD TO WHAT APPROXIMATE MAGNITUDE OF LOAD CHANGE IN A TYPICAL 10000 MW SYSTEM?

A

200MW

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

A GOVERNOR WITH A 0% DROOP IS CALLED?

A

A ISOCHRONUS GOVERNOR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

STEAM TURBINE GENERATORS TYPICALLY HAVE BETTER GOVERNOR RESPONSE THAN HYDRO-ELECTRIC GENERATING UNITS

A

FALSE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A CONTROL AREA’S FREQ. BIAS SETTING IS EQUAL TO

A

ALL OF THE ABOVE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

ALL OF THE FOLLOWING ARE MODES OF AGC EXCEPT

A

ISOCHRONUS CONTROL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

IN WHICH STAGE OF A GENERATORS RESPONSE TO A SYSTEM DISTURBANCE IS THE POWER FLOW SUPPORTED PRIMARILY BY THE GENERATORS EXCITATION SYSTEM

A

ELECTROMAGNETIC ENERGY STAGE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

IF SYSTEM FREQ. WERE TO RUN AT 60.02 HZ FOR TWO CONSECUTIVE HOURS HOW MUCH POSITIVE TIME ERROR WOULD OCCUR

A

2.4 SECONDS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

A CONTROL AREA HAS A BIAS OF -150 MW. FREQ. FALLS 0.05HZ DUE TO AN EXTERNAL DISTURBANCE. HOW MANY MW WOULD YOU EXPECT THIS CONTROL AREA TO PROVIDE TO THE DISTURBANCE?

A

75

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

AN ISOCHRONOUS GOVERNOR HAS A DROOP SETTING OF

A

0%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

WHAT ELEMENT OF THE POWER SYSTEM IS TYPICALLY MOST SUSCEPTIBLE TO DAMAGE FROM PROLONGED OPERATION AT FREQ. ABOVE OR BELOW 60HZ

A

LOW PRESSURE TURBINE STAGE BLADES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

THE NORTH AMERICAN POWER SYSTEM IS DIVIDED INTO AREAS CALLED INTERCONNECTIONS

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

TIME ERROR PROBLEM: 60HZ=NO TIME UNDER-GENERATION=FAST TIME OVER-GENERATION=SLOW TIME ERROR

A

FALSE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

ALL LOADS CAN BE DIVIDED INTO TWO GENERAL TYPES THEY ARE NON MOTOR LOAD AND MOTOR LOAD

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

IF THE VOLTAGE FALLS ENOUGH IT WILL CAUSE THE MOTOR TO SPEED UP

A

FALSE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

ELECTRIC GENERATORS USE A _______ CONTROL SYSTEM TO CONTROL SHAFT SPEED

A

GOVERNOR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

THE TYPE OF GOVERNORS THAT ARE COMMON ON OLDER UNITS IS A CENTRIFUGAL BALLHEAD

A

TRUE

17
Q

TWO TYPES OF UTILITY GENERATORS THAT USE GOVERNOR CONTROL SYSTEM ARE STEAM TURBINE/GENERATORS AND HYDRO TURBINE/GENERATORS

A

TRUE