WHAT ARE THE CONDITIONS THAT MUST OCCUR BEFORE A ROCKFILL DAM CAN PROVE TO BE ECONOMICAL

A

ALL OF THE ABOVE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

DOES UPLIFT PRESSURES AND EROSION CAUSED BY SEEPAGE THROUGH A ROCKFILL DAM GENERALLY CAUSE PROBLEMS

A

NO ROCKFILL MATERIALS DO NOT GENERALLY CONSTITUTE SIGNIFICANT DESIGN PROBLEMS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

NAME MATERIALS THAT ARE USED AS IMPERVIOUS MATERIAL IN A ROCKFILL DAM

A

-STEEL
-WOOD
-CONCRETE
-EARTH MATERIAL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

2 ADVANTAGES OF USING AN INTERNAL MEMBRANE IN A ROCKFILL DAM ARE SHORTER GROUT CURTAIN LENGTHS AND LESS TOTAL AREA EXPOSED TO WATER

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

BED ROCK FOUNDATIONS THAT ARE SOFT AND EROSION RESISTANT ARE THE MOST DESIRABLE FOR A ROCKFILL DAM

A

FALSE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

LIMITED SETTLEMENT IS CRITICAL IN THE CONSTRUCTION OF ROCK FILL DAMS BECAUSE EXCESSIVE SETTLEMENT MAY RUPTURE THE UPSTREAM MEMBRANE OR CAUSE JOINT SEPARATION WITH SUBSEQUENT WATER LOSS

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

NAME SOME ADVANTAGES OF ASPHALTIC CONCRETE

A

ALL OF THE ABOVE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly