EOC Questions CH.2 Flashcards
What is the secondary mission of the A/S32A-30A?
Tow small aircraft
The A/S32A-30A is primarily designed for towing…
Ground support equipment
The A/S32A-32 tow tractor is controlled by the use of a what?
Joystick
What is the maximum towing capacity of the A/S32A-30A?
40,000lbs
The overall height of the A/S32A-32 towing tractor is how many inches?
30”
What is the drawbar pull of the A/S32A-32?
14,000lbs
How many phases are there in the ground support licensing program?
Two
Who will handle the phase two portion f the ground licensing program?
Division
Phase two of the ground support licensing program covers what?
OJT
What type of material is the NWC-4 universal wheel chock made from?
Polyurethane
What is the difference between the regular TD-1B and the type used on amphibious assault ships?
Length
For specific information concerning the high power tiedown assembly for each type of aircraft, you would refer to the what?
17-1-537
When utilizing the NWC-4 universal wheel chock, where should the adjustable end of the chock be placed on the aircraft wheel?
Aft
The TD-1B can be tightened by the use of the
Tension assembly
The 24 ALBAR is designed specifically for what aircraft?
SH-60
When the aircraft elevator is loaded to capacity, with all pumps in use, what is the total duty cycle time?
60 seconds
The horizontal locking bars of the aircraft elevator are powered how?
Pneumatically
Aircraft elevator safety stanchions should not be operated in what mode?
Automatic
V-1 division is responsible for what part of the aircraft elevator operation?
Flight deck
V-3 division is responsible for what part of the elevator operation?
Hangar deck
“A” division is responsible for what part of the elevator operation?
Machinery room
There are how many different compositions of nonskid?
Two
Nonskid coating kits are supplied in how many components?
Two
The shelf life of nonskid is…
1 year
What is the most preferred method of nonskid removal?
Water-jetting
In order to ensure the correct primer coverage, the DFT reading must be taken when the primer has…
Cured
When completing the primer application process, what will allow corrosion to set in and degrade the process?
Holidays
VLA markings on the hangar deck are placed ____ from the deck.
14 Feet
The ships frame number markings are placed on both the starboard and port bulkheads at frame intervals of___.
10 frame intervals
For what class ship does the Naval Air Warfare Center Visual Landing Aids General Service Bulletin No. 8 establish standard certification requirements and inspections?
CVN