Electrics Flashcards

1
Q

Name the five different sources of AC power

A

2 IDG:s
1 APU
1 Inverter
1 RAT
1 AC external power receptacle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Name three different DC power sources

A

1 DC external power receptacle
2 NiCd batteries
3 TRU:s

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When does the led light next to the IDG selector knob illuminate?

A

When you get EICAS caution IDG 1(2) OIL.

This is to indicate which one to disconnect.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is checked regarding AC power when you see ”AVAIL” in the GPU push button?

A
  1. Voltage
  2. Amperage
  3. Frequency
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which battery is used for APU starting?

A

Battery 2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What does it mean that a line between two components is green on the electrical synoptic page?

A

Voltage is sensed.

If not the line is white.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When RAT is deployed, how many seconds before you get AC power from the RAT to which bus?

A

After 8 seconds RAT supplies 115 VAC to the AC ESS BUS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the voltage and the Amperage of the two NiCd batteries?

A

22,8 V

27 A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

EICAS warning “BATT 1(2) OVERTEMP”

What temperature is sensed in the battery?

A

70 degrees C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Where is SPDA 1 located?

A

FWD e-bay

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Where is SPDA 2 located?

A

Center e-bay

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the priority order regarding power sources in normal ops?

A
  1. Respective IDG
  2. APU generator
  3. GPU
  4. Opposite IDG
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is shed by the SPDA:s when you get EICAS advisory message “LOAD SHED”?

A
  1. Galley
  2. Right hand windshield heating
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What does the EICAS warning “ELEC EMERCENCY” mean?

A

AC main buses are deenergized.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What does the EICAS caution “GPU CONNECTED” mean?

A
  1. AC/DC GPU is connected and;
  2. Parking brake released
How well did you know this?
1
Not at all
2
3
4
5
Perfectly