Electrical Flashcards

0
Q

Where are the batteries located?

A
  • 1 located in aft equipment bay

- 1 located in nose compartment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

How many batteries?

A

-2 nickel cadmium (nicad) batteries

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the external power priority?

A

-the lowest priority

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the purpose of the IDGs?

A

Converts variable N2 engine speed to 12,000 RPM generator speed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What does an IDG fault light indicate?

A

High oil temperature or low oil pressure within the IDG

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

AC Bus 1 priority system

A
  • Generator 1
  • APU generator
  • Generator 2
  • External power
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

AC Bus 2 priority system

A
  • Generator 2
  • APU generator
  • Generator 1
  • External power
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When will AC ESS XFER switch light illuminate?

A

Anytime the AC BUS 1 is not powering the AC ESS BUS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Will the AC ESS XFER light illuminate with just the battery master switch on?

A

Yes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How many TRUs are there?

A

4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

IDG overload protection

A
  • 45 KVA for 5 mins

- 60 KVA for 5 seconds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When can the IDG be rest if it is disconnected?

A

Only on the ground after the engine is shut down

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When will the AVAIL portion of the external power switchlight illuminate?

A

GPU plugged in with proper voltage, frequency, and phase (115v, 400hz, 3 phase)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What does pressing the external AC switchlight on the external panel do?

A
  • Supplies external power to the aircraft in the service configuration
  • Powers the AC service bus only
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the 4 AC busses?

A
  • AC bus 1
  • AC bus 2
  • AC ESS (essential) bus
  • AC SERV (service) bus
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

If the AC ESS BUS is being powered by the ADG and a generator is brought back online, will the essential bus switch power sources?

A

No, the PWR TXFR OVERRIDE button must be pushed

16
Q

When will the ADG deploy?

A

When AC BUS 1 and 2 are unpowered with weight off wheels

17
Q

What will the ADG power?

A

Flaps, slats, pitch trim, hydraulic pump 3B, and AC ESS bus

18
Q

With the ADG deployed when must the aircraft be configured by?

A

140 KIAS

19
Q

Can the ADG be stowed inflight?

A

No

20
Q

How many DC busses are there?

A

9

21
Q

What is the purpose of the TRUs?

A

Converts 115v AC to 28v DC and 120 amps

22
Q

What happens when the DC Service Switch is turned on?

A

The DC Service Bus is directly connected to the APU Battery Direct Bus

23
Q

What is the main battery rated at?

A

24v 17 amp/hour

24
Q

What is the APU battery rated at?

A

24v 43 amp/hour

25
Q

What charges the main battery?

A

AC BUS 1

26
Q

What charges the APU battery?

A

AC service bus

27
Q

What happens when the battery switch is turned on?

A

Battery bus is directly connected to both the Main and APU Battery Direct buses

28
Q

If all generators fail and the ADG is inop, how long can the batteries supply DC emergency power for?

A

Approximately 30 minutes

29
Q

What supplies power to the fire extinguishers and hydraulic and fuel shutoff valves?

A

DC EMERG BUS

30
Q

What happens when you turn the DC Service Switch on?

A

Directly connects the DC SERV BUS to the APU BATT DIR BUS