ECDIS Flashcards
What is Compilation scale?
The scale at which the data was originally compiled, which can be a scale at which the survey was conducted.
What is the Scamin function?
The smallest scale at which an object will not be displayed.
What are the dimension requirements for chart display?
270mm x 270mm
What are the minimum formats required by the IMO
- North up
- True motion.
What is required for ECDIS to be a primary means of navigation?
What is IHO S57?
This standard is a simplified model of the reality and consists of georeferenced and non-georeferenced data.
What is IHO S52?
The standard that defines the presentation of the information on the ECDIS screen which has been encoded according to the S57 standard.
What is IHO S61?
This standard sets out the calculations with regards to the plotting of WGS84 positions onto electronic charts.
What is IHO S63?
This standard specifies a method of securing ENC information and maintaining the integrity on an ENC service with multiple data services serving a large customer base.
What are the ENC chart scale categories?
- Overview
- General
- Coastal
- Approach
- Harbour
- Berthing
What does the presence of jail bars mean?
25% or more of chart information is not being show at the current scale.
What does CATZOC mean?
Categoric Zone of confidence
What are the 6 CATZOC categories?
- A1 = 6 stars
- A2 = 5 stars
- B = 4 stars
- C = 3 stars
- D = 2 stars
- Avoid U = Unassessed