Describe the RCP #1 seal design including type of seal, DP, and leakage flow rate. Also state how long by design an RCP can operate without all support systems.
Film riding seal
CCP Discharge - VCT Pressure
3 gpm
1 min
What is the challenge to the primary during a loss of all AC power?
Loss of inventory through RCP seals with no makeup
Describe FRP implementation during a loss of all AC
FRPs are not implemented until directed in recovery procedure
When and at what rate is the secondary depressurized per ECA-0.0?
When at least one SG >13% NR depressurize at max rate within capacity to maintain SG level
Prevent undershoot 160#
If all SG levels fall below 13% NR depressurization must be stopped until level is restored
What conditions determine which recovery procedure is entered after power is restored in ECA-0.0?
Subcooling >40
PRZ level >20%
ECCS equipment has not actuated
All must be satisfied to enter ECA-0.1
Why is the secondary depressurization performed in ECA-0.0?
Minimize inventory loss through RCP seals to extend time to core uncovery
Why is seal return isolated in ECA-0.0?
Prevent loss of NPSH and flashing at the CCP suction from high temp water
Prevent radioactive release in aux building
Prevent exceeding max seal leakoff flow rates
Why does ECA-0.0 direct that the letdown isolation valves be closed rather than containment isolation valves on the letdown line?
Prevent RCS leakage from the letdown relief to the PRT
What is the pressure value and the basis for the pressure value where the SG depressurization stopped in ECA-0.0?
290psig
Prevent Nitrogen injection
Why is SI reset in ECA-0.0?
Prevent automatic loading of equipment on restored bus
Why are emergency bus loads take to pull to lock?
To prevent overloading the restored power source
ESW left running for EDG
What actions are taken when power to an emergency bus is restored during performance of ECA-0.0?
Go to step 34, determine if ELAP in progress
What is the reason for the loop ECA-0.0 places you in?
Continuously monitor plant conditions while waiting for power restoration
Prior to restoring power what procedures and under what conditions can a transition be made from ECA-0.0?
SACRG-1 if highest 5 CETCs > 1200 F and rising
Why are the CCPs and CCW pumps prevented from starting upon restoration of power?
Prevent thermal shock to RCP seals and steam introduction to the CCW system