List the four phases of a LBLOCA?
Blowdown
Refill
Reflood
Long Term Recirc
When does ECCS injection reach the intact loops?
Reflood Phase
What does the accident analysis 10.CFR.50.59 state?
Some fuel damage may occur
None of the ECCS acceptance criteria will be exceeded
Why is the TCA for transfer to cold leg recirc 5 min?
Ensure Peak Clad Temp not exceeded
How much time must pass prior to placing RHR Spray in service?
50 Min to ensure decay heat can be removed from CCPs and SI pps
What is the threshold for a SBLOCA?
Greater than the capacity of the charging system
What is the threshold for a LBLOCA?
Below shutoff head of RHR pumps (>400gpm)
Why are RCps tripped during a LBLOCA?
Loss of CCW on Phase B
Three phases of SBLOCA?
blowdown
reflood
long term recirc
What must be done if a SG is found to be depressurizing during E-1 step 2 and cannot be isolated due to equipment failures?
Consider it isolated and move on in E-1
What is the purpose of checking any SG pressure lowering or RCS pressure rising in E-1 Step 9?
To determine if faulted SG is still blowing down and loop through procedure again to determine if SI can be terminated
What is the basis for accumulator isolation with RCS pressure <150psig?
Accumulator water has already injected and all that remains is N2
What must the crew do if a Red path is identified while transferring to ES-1.3?
Complete portions of ES-1.3 until it tells you to begin monitoring status trees again
While responding to a LOCA RCS pressure is above RHR pump head but lowering. Should the RHR pups be stopped?
No, pressure may lower below their shutoff head at some point
While performing E-1 what conditions must be satisfied to allow CTS pumps to be stopped?
Ctmnt pressure <2psig
When would hot leg recirc be utilized following a SBLOCA and why would it not normally be used?
If sub cooling was not restored use it
If sub cooling is restored concentrated boric acid in the core would not occur
Why must SI pumps be stopped during alignment to hot leg recirc?
Dead head the pump, mini flows closed during cold leg recirc alignment
Where do the ECCS pumps discharge during hot let recirc?
RHR and SI to hot legs
CCP to cold legs
What must be done if only one SI pump recirc valve will close while swapping to cold leg recirc?
Only one required they are in series
What is the basis for splitting CCW trains in ES-1.3?
Prevent pump runout if one were to trip