E-2 Daily Quiz Flashcards

1
Q

Define a small and intermediate sized secondary break

A

Small - MFW system maintains levels

Inter - RX trip will occur ~5 min

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What secondary breaks will not result in a safety injection with proper operator action?

A

Downstream of MSSV

Upstream of FW Check Valve

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Procedure flow paths for secondary break with and without SI?

A

W/O E-0 > E-2 > ES-1.1

W/ E-0 > E-2 > E-1 > ES-1.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

UFSAR assumptions to a steamline break

A

EOL
Most reactive rod stuck out
ECCS injection at 2400ppm
Return to critical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Why must AFW flows be lowered periodically following a steamline break?

A

Lowering decay heat levels

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Three reasons to limit plant heatup after the faulted generator has finished blowing down

A

PRZ overfill
Water relief through PORVs
Delta P acrossed SG tubes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Major actions of E-2

A

Main steam line isolation
One non faulted SG
Isolate faulted
Check for SGTR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Time critical action to isolate AFW following a faulted SG

A

30 min

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

One SG has a faulted FW line after isolation is complete the operator realizes that the other three pressures are lowering uncontrollably what must be done?

A

Transition to ECA-2.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the purpose of checking for any SG pressure lowering uncontrollably or RCS pressure rising in E-1?

A

Once the faulted SG is done blowing down RCS pressure should rise and SI termination criteria met.
If not SBLOCA is suspected

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What signal will generate an SI during an uncontrolled depressurization of a SG?

A

Low steamline pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What happens to heat transfer rate as Tavg lowers?

A

Lowers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the limiting challenge to the core during an uncontrolled depressurization of a SG?

A

Pressurized thermal shock

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What will happen to RCS pressure and cause PRZ level to eventually rise while in E-1 loop for a faulted steam generator that is still blowing down?

A

ECCS flow > shrinkage rate once cooldown is over

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Minimum AFW flow when all SGs are faulted?

A

25k per to prevent dryout

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

While in ECA-2.1 it is noted that the cooldown was >100 degrees in 60 min what must be done with AFW flow?

A

Lower to 25k to each

17
Q

Major action categories of ECA-2.1?

A
Establish secondary pressure boundary
Control feed flow to:
-limit cooldown
-prevent overfill
Terminate SI
Cooldown to place RHR in service
Cooldown to cold shutdown
18
Q

What actions are taken if SG level is rising uncontrollably while in ECA-2.1?

A

E-3

19
Q

What must be met to transition from ECA-2.1 to E-2?

A

Pressure boundary restored unless terminating SI in steps 10-20

20
Q

When will SI pumps be stopped in ECA-2.1?

A

SI termination criteria met with RCS pressure > SI pp shutoff head and rising

21
Q

What is the basis for ECA-2.1 Att A?

A

Complete local check of valves for each SG to restore integrity to at least one as early as possible