Drop Stuff Flashcards
Three methods for burying cable
Hand digging, trenching, Joint trenching
Burying a cable of conduit in the same trench as the power or phone lines when they are installed on the property
Joint trenching
using a shovel or hand-held tool
Hand digging
Using a specialized mechanical equipment
Trenching
Cable guard should extend ___ feet above the ground at the house
4 feet
Cable guard should extend ___ inches into the ground at the house
8 Inches
Cable guard should extend ____ feet at the pole past the ground
8 feet
Cable guard should extend ____ inches into the ground at the pole
8 inches
A follow up underground drop replacement should be scheduled within __ days if spliced with supervisor approval
14 days
All temp drops should not be laid across these two areas
pedestrian walkways, traffic paths
RTV
Room Temperature Vulcanizing
Docsis
Data over Cable service interface specification