1
Q
Do you see the Contractor as an adversary or as a partner?
A
Partner, teamwork
2
Q
How do you correct poor performance from a contractor?
A
-Why is there poor performance? Analyze and identify
Bring expertise with motivation and rewards
- Attend meeting and identify cause of poor performance by being open and no blame culture
- Strategic plan more ambitious at alerting potential problems that has a length of three weeks
3
Q
How do you resolve conflicts?
A
- Create an environment that both parties are one team, objective and interest are same.
- Make sure you conduct negotiation in resolving conflicts on win – win situation (everyone is a winner).
- A spirit of teamwork (QA/QC Quality Assurances/Quality Control)
4
Q
What are the essential elements for an Electrical Engineering review?
A
Compliance to the standard (QAQC), timing review (SAFOP).
5
Q
What do we mean with a technical audit?
A
Relevant required documents to review validity
6
Q
What is the difference between an audit and a review?
A
Audit – Examination of a system to ensure it is effective for the purpose and audit report must contain observation and non-conformance