Document verification and Approval* Flashcards

1
Q

Do you see the Contractor as an adversary or as a partner?

A

Partner, teamwork

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How do you correct poor performance from a contractor?

A

-Why is there poor performance? Analyze and identify
Bring expertise with motivation and rewards

  • Attend meeting and identify cause of poor performance by being open and no blame culture
  • Strategic plan more ambitious at alerting potential problems that has a length of three weeks
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How do you resolve conflicts?

A
  • Create an environment that both parties are one team, objective and interest are same.
  • Make sure you conduct negotiation in resolving conflicts on win – win situation (everyone is a winner).
  • A spirit of teamwork (QA/QC Quality Assurances/Quality Control)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the essential elements for an Electrical Engineering review?

A

Compliance to the standard (QAQC), timing review (SAFOP).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What do we mean with a technical audit?

A

Relevant required documents to review validity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the difference between an audit and a review?

A

Audit – Examination of a system to ensure it is effective for the purpose and audit report must contain observation and non-conformance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly