DESIGN PROCESS Flashcards

1
Q

DIVISION 1: _______
- temporary facilities
- quality reqs
- execution

A

general requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

DIVISION 2: _____
- site preparation
- earthwork

A

site construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

DIVISION 3: ____
- concrete materials
- reinforcements

A

concrete

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

DIVISION 4: ____
- masonry units
- stone

A

masonry

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

DIVISION 5: ____
- structural metal framing
- joists
- fabrications

A

metals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

DIVISION 6: ____
- materials and methods
- carpentry

A

wood and plastics

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

DIVISION 7: ____
- damp and proofing and waterproofing
- thermal protection
- shingles

A

moisture and thermal protection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

DIVISION 8: ____
- doors and frames
- entrances and storefronts

A

doors and windows

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

DIVISION 9: ____
- support assembles
- plaster and gypsum board
- tiles, terrazzo

A

finishes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

DIVISION 10: ____
- visual display boards
- louvers

A

specialties

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

DIVISION 11: ____
- security and vault
- teller and service

A

equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

DIVISION 12: ____
- frabrics
- art
- furniture

A

furnishing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

DIVISION 13: ____
- air-supported structures
- aquariums
- pools
- fire suppression

A

special construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

DIVISION 14: ____
- elevators
- escalators

A

conveying systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

DIVISION 15: ____
- service piping
- plumbing fixtures and equipment
- refrigeration

A

mechanical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

DIVISION 16: ____
- wiring methods
- lighting
- sound and video

A

electrical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

the architect is required to get as much valuable data about site excavation and building erection at the project site

A

site investigation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

methods of exploration

A

test pits
test borings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

for shallow work, an open pit is the most suitable method since it calls for an actual inspection of the undisturbed material over a considerable area (maghuhukay)

A

test pits

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

for excavations that carried no deeper than the proposed level, to underlying material may be investigated by __

A

test boring

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

made to assist in determining its safe bearing capacity

A

loading test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

the process of digging the earth to provide a place for the foundation of the building

A

excavation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

processes that change land elevation and slope by filling low spots and shaving off high spots

A

levelling and grading

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

process if compacting the soil on which structure will rest

A

stabilizing the soil

25
Q

law that provides that any person making an excavation is responsible for resulting damage to adjoining property

A

protection of adjoining structure

26
Q

process of temporarily supporting a building structure with shores to prevent the retained soil from overturns or collapse

A

shoring

27
Q

format developed by the construction specifications for coordinating specifications, filling of technical data…

A

uniform system/masterformat

28
Q

to fabricate of manufacture beforehand, especially in standardized units or components for quick assembly or erection

A

prefabricate

29
Q

the excavation and embankment of earth in connection with an engineering operation

A

earthwork

30
Q

any of a number timber, steel or precast concrete planks driven vertically side by side to retain earth or prevent water from seeping into an excavation

A

sheet pile

31
Q

a number of boards joined together side by side to retain the face of excavation

A

lagging

32
Q

method for planning, scheduling, managing a project, combining all relevant information into a flow chart…

A

CPM (critical path method)

33
Q

a technique of constructing multistory building in which all horizontal slabs are cast at ground level and when cured are raised into position by hydraulic jacks

A

lift-slab construction

34
Q

a method of casting reinforced concrete wall panels on site in a horizontal position, then tilting them up into their final position

A

tilt-up construction

35
Q

work done at a site in preparation for construction project

A

sitework

36
Q

one of the legally defined and recorded boundaries of a parcel land

A

property line

37
Q

a steel rod or tendon attached to a deadman or rock or soil anchor to prevent lateral movement of a retaining wall or formwork

A

tieback

38
Q

a steel h-section driven vertically into the ground to support horizontal sheeting or lagging

A

soldier pile/beam

39
Q

an inclined shore for supporting a wall

A

raker/raking shore

40
Q

a horizontal strut fixed between and supporting two walls above ground level

A

flying shore

41
Q

a watertight enclosure constructed underwater

A

cofferdam

42
Q

to remove water from an excavation job site, usually draining or pumping

A

dewater

43
Q

the ground elevation at any specific point on a construction site (ground meets the foundation of the building)

A

grade

44
Q

the elevation of the original ground surface before excavation or grading begins

A

existing grade

45
Q

the elevation of drives, walks, lawns or other improved surfaces

A

finish grade

46
Q

occuring or situated below the surface of the ground

A

below grade

47
Q

system of supports that enables an existing foundation to be rebuilt, strengthened…

A

underpinning

48
Q

the cutting, filling and shaping of earth in preparation for finish grading

A

rough grading

49
Q

to refill an excavation with earth, stone or other material

A

backfill

50
Q

the prepared earth surface upon which a pavement, concrete slab or foundation is built.

A

subgrade

51
Q

a short beam passed through a wall as a temporary support while the foundation or part beneath is repaired, altered or strengthened

A

needle/needle beam

52
Q

an upright timber for supporting dead load during the structural alteration of a building

A

dead shore

53
Q

the top layer of the earth’s surface

A

soil

54
Q

the fertile surface layer of soil as a distinct from the subsoil

A

topsoil

55
Q

the bed or layer of earth immediately beneath the surface soil

A

subsoil

56
Q

a single bed or layer of sedimentary earth or rock having the same composition throughout, lying between beds of another kind

A

stratum

57
Q

the self weight of the structure and building elements, fixtures. equipments permanently attached to it (walls, floors)

A

dead load

58
Q

any movable load on a structure resulting from occupancy (collected water, people, furniture)

A

live load

59
Q

to construct by assembling diverse and usually standardized parts

A

fabricate