DESIGN PROCESS Flashcards

1
Q

DIVISION 1: _______
- temporary facilities
- quality reqs
- execution

A

general requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

DIVISION 2: _____
- site preparation
- earthwork

A

site construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

DIVISION 3: ____
- concrete materials
- reinforcements

A

concrete

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

DIVISION 4: ____
- masonry units
- stone

A

masonry

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

DIVISION 5: ____
- structural metal framing
- joists
- fabrications

A

metals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

DIVISION 6: ____
- materials and methods
- carpentry

A

wood and plastics

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

DIVISION 7: ____
- damp and proofing and waterproofing
- thermal protection
- shingles

A

moisture and thermal protection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

DIVISION 8: ____
- doors and frames
- entrances and storefronts

A

doors and windows

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

DIVISION 9: ____
- support assembles
- plaster and gypsum board
- tiles, terrazzo

A

finishes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

DIVISION 10: ____
- visual display boards
- louvers

A

specialties

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

DIVISION 11: ____
- security and vault
- teller and service

A

equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

DIVISION 12: ____
- frabrics
- art
- furniture

A

furnishing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

DIVISION 13: ____
- air-supported structures
- aquariums
- pools
- fire suppression

A

special construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

DIVISION 14: ____
- elevators
- escalators

A

conveying systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

DIVISION 15: ____
- service piping
- plumbing fixtures and equipment
- refrigeration

A

mechanical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

DIVISION 16: ____
- wiring methods
- lighting
- sound and video

A

electrical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

the architect is required to get as much valuable data about site excavation and building erection at the project site

A

site investigation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

methods of exploration

A

test pits
test borings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

for shallow work, an open pit is the most suitable method since it calls for an actual inspection of the undisturbed material over a considerable area (maghuhukay)

A

test pits

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

for excavations that carried no deeper than the proposed level, to underlying material may be investigated by __

A

test boring

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

made to assist in determining its safe bearing capacity

A

loading test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

the process of digging the earth to provide a place for the foundation of the building

A

excavation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

processes that change land elevation and slope by filling low spots and shaving off high spots

A

levelling and grading

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

process if compacting the soil on which structure will rest

A

stabilizing the soil

25
law that provides that any person making an excavation is responsible for resulting damage to adjoining property
protection of adjoining structure
26
process of temporarily supporting a building structure with shores to prevent the retained soil from overturns or collapse
shoring
27
format developed by the construction specifications for coordinating specifications, filling of technical data...
uniform system/masterformat
28
to fabricate of manufacture beforehand, especially in standardized units or components for quick assembly or erection
prefabricate
29
the excavation and embankment of earth in connection with an engineering operation
earthwork
30
any of a number timber, steel or precast concrete planks driven vertically side by side to retain earth or prevent water from seeping into an excavation
sheet pile
31
a number of boards joined together side by side to retain the face of excavation
lagging
32
method for planning, scheduling, managing a project, combining all relevant information into a flow chart...
CPM (critical path method)
33
a technique of constructing multistory building in which all horizontal slabs are cast at ground level and when cured are raised into position by hydraulic jacks
lift-slab construction
34
a method of casting reinforced concrete wall panels on site in a horizontal position, then tilting them up into their final position
tilt-up construction
35
work done at a site in preparation for construction project
sitework
36
one of the legally defined and recorded boundaries of a parcel land
property line
37
a steel rod or tendon attached to a deadman or rock or soil anchor to prevent lateral movement of a retaining wall or formwork
tieback
38
a steel h-section driven vertically into the ground to support horizontal sheeting or lagging
soldier pile/beam
39
an inclined shore for supporting a wall
raker/raking shore
40
a horizontal strut fixed between and supporting two walls above ground level
flying shore
41
a watertight enclosure constructed underwater
cofferdam
42
to remove water from an excavation job site, usually draining or pumping
dewater
43
the ground elevation at any specific point on a construction site (ground meets the foundation of the building)
grade
44
the elevation of the original ground surface before excavation or grading begins
existing grade
45
the elevation of drives, walks, lawns or other improved surfaces
finish grade
46
occuring or situated below the surface of the ground
below grade
47
system of supports that enables an existing foundation to be rebuilt, strengthened...
underpinning
48
the cutting, filling and shaping of earth in preparation for finish grading
rough grading
49
to refill an excavation with earth, stone or other material
backfill
50
the prepared earth surface upon which a pavement, concrete slab or foundation is built.
subgrade
51
a short beam passed through a wall as a temporary support while the foundation or part beneath is repaired, altered or strengthened
needle/needle beam
52
an upright timber for supporting dead load during the structural alteration of a building
dead shore
53
the top layer of the earth's surface
soil
54
the fertile surface layer of soil as a distinct from the subsoil
topsoil
55
the bed or layer of earth immediately beneath the surface soil
subsoil
56
a single bed or layer of sedimentary earth or rock having the same composition throughout, lying between beds of another kind
stratum
57
the self weight of the structure and building elements, fixtures. equipments permanently attached to it (walls, floors)
dead load
58
any movable load on a structure resulting from occupancy (collected water, people, furniture)
live load
59
to construct by assembling diverse and usually standardized parts
fabricate