DESIGN PROCESS Flashcards
DIVISION 1: _______
- temporary facilities
- quality reqs
- execution
general requirements
DIVISION 2: _____
- site preparation
- earthwork
site construction
DIVISION 3: ____
- concrete materials
- reinforcements
concrete
DIVISION 4: ____
- masonry units
- stone
masonry
DIVISION 5: ____
- structural metal framing
- joists
- fabrications
metals
DIVISION 6: ____
- materials and methods
- carpentry
wood and plastics
DIVISION 7: ____
- damp and proofing and waterproofing
- thermal protection
- shingles
moisture and thermal protection
DIVISION 8: ____
- doors and frames
- entrances and storefronts
doors and windows
DIVISION 9: ____
- support assembles
- plaster and gypsum board
- tiles, terrazzo
finishes
DIVISION 10: ____
- visual display boards
- louvers
specialties
DIVISION 11: ____
- security and vault
- teller and service
equipment
DIVISION 12: ____
- frabrics
- art
- furniture
furnishing
DIVISION 13: ____
- air-supported structures
- aquariums
- pools
- fire suppression
special construction
DIVISION 14: ____
- elevators
- escalators
conveying systems
DIVISION 15: ____
- service piping
- plumbing fixtures and equipment
- refrigeration
mechanical
DIVISION 16: ____
- wiring methods
- lighting
- sound and video
electrical
the architect is required to get as much valuable data about site excavation and building erection at the project site
site investigation
methods of exploration
test pits
test borings
for shallow work, an open pit is the most suitable method since it calls for an actual inspection of the undisturbed material over a considerable area (maghuhukay)
test pits
for excavations that carried no deeper than the proposed level, to underlying material may be investigated by __
test boring
made to assist in determining its safe bearing capacity
loading test
the process of digging the earth to provide a place for the foundation of the building
excavation
processes that change land elevation and slope by filling low spots and shaving off high spots
levelling and grading