CVCS (Normal Letdown, Excess Letdown) Flashcards

Flow Path, set points

1
Q

Safety Related Functions

2

A

1) The CVCS shall be capable of making and holding the core subcritical from any standby or hot operating condition.

2) The CVCS shall be capable of making the core subcritical under
credible accident conditions, w/ appropriate margins for
contingencies, and limiting and subsequent return to power such
that there will be no undue risk to the health and safety of the
public.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Purpose

5

A

Maintain:

1: RCS chemistry
2: RCS inventory
3: RCP seal water flow
4: Maintain boron concentration
5: Reduce quantity of Fission products/corrosion products also provides for filling and venting of the RCS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Valves that Fail Open on loss of air

5

A
PCV-145
HCV-121
FCV-113A
CVC-310A/B
CVC-303A/B/C
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

ThumbRule

A

All 3-way valves in the CVCS fail “To VCT”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Effects of loss of IA on CVCS

4 responses

A
  1. Letdown is isolated (valves fail closed) [CVC-200a/b/c and LCV-460A/B]
  2. Charging to loops fail open CVC-310A/B as does HCV-121
  3. All AOV’s in makeup control fail shut except for the boric acid to blender valve FVC-113A.
  4. Excess Letdown inoperable.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Letdown Stop Valves (LCV-460 A and B)

A
  • From Loop 1 cold Leg
  • Fail close loss of air, or DC power
  • In auto will close at 14.4% level in PZR (does not auto reopen)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Regen heat exchanger

A
  • Charging through tubes, should be within 50F of RCS temp.
  • 547F to 290F Letdown flow temp change
  • 130F to 290F Charging flow temp change
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Orifice Isolation Valves (CVC-200 A,B,C)

A

Close on phase A, loss of air, loss of DC power or manually

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Letdown orifices and flows

A
  • A 45gpm
  • B,C 60gpm
  • Reduces PSIG from 2235 to 300. (Controlled by PCV-145 setpoints)
  • Max Letdown flow is 120gpm to prevent channeling of demineralizer resin.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Low Pressure Letdown Relief Valves (CVC-203 A,B)

A
  • set to 500psig and 630psig

- Relieves to the PRT (Pressurizer relief tank)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Letdown Line Isolation Stops (CVC-204 A, B)

location

A
  • Fail closed
  • Shut on Phase A
  • Have needle valves in air supply lines designed to shut valves after 200s to prevent lifting the relief 203s
  • In pipe ally
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

HCV-143

location

A
  • RHR tie in line after 204s

- RHR heat exchanger room after Charging pump room

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Non-Regen Heat Exchanger

A
  • Letdown through tubes, CCW through shell

- TCV-144 (fails open) on CCW outlet side from TE-144 controls outlet temp between 100-115F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Temperature limit on outlet of NRHX?

Why?

A

Must be kept <140F to protect resin

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

(TCV-143)
VCT/Demin Diversion Valve
location

A
  • 3 way valve to bypass demins
  • Auto diverts at 135F, will swap back at 130F
  • Fails to VCT
  • 1st floor Non-regen heat exchanger room
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

(PCV-145)
Low Pressure Letdown Valve
Location

A
  • Maintains 300psig upstream.
  • Fails open
  • First floor non-regen room.
17
Q

CVC-209

Low Pressure Letdown relief Valve

A
  • Set at 200psig
  • relieves to the VCT
  • between PCV-145 and TCV-143
18
Q

Demin Beds

A
  • Mixed beds (LIOH normally in service and HOH) 120gpm
  • Cation bed, limited to 60gpm, reduces lithium concentration
  • Deborating beds - Cooler water absorbs boron, Hotter water releases Boron from resin. 1:1 ratio as adding PW
19
Q

CVC-244

Deborating Demin valve

A

-Fails to VCT

20
Q

RCS Filter

Zinc injection skid

A
  • removes impurities and resin fines
  • Changed out at 20psid D/P, or high rad
  • Zinc reduces outage dosage, in batch tank room
21
Q

LCV-115A
VCT holdup tank Diversion Valve
location

A
  • Diverts at 30-39” from LT-112
  • trips to full divert at 51.6” from LT-115 (resets at 45.6”)
  • Fails to VCT
  • RCS filter room
22
Q
VCT (gas inlets and outlets)
PCV-119 
PCV-118
PCV-117
PCV-199
A
  • PCV-119 Nitrogen (used for cover gas/shutdown)
  • PCV-118 Hydrogen (normally in service)
  • PCV-117 to Waste Gas Compressor
  • PCV-199 to Gas Analyzer

All in the RC Filter room