Current Affairs Flashcards

1
Q

What has changed in the industry since Grenfell?

A
  • No combustible materials over 18m
  • Sprinklers for all buildings above 11m
  • Hackitt review
  • Compartmentalisation
  • Fire rated walls / doors
  • Fire safety bill
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Why did Carillion go into liquidation?

A
  • Took unacceptable risk on PFI projects
  • Very large debt pile which was unmanageable
  • Very high liabilities (FM projects)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the RICS doing about Covid19?

A
  • Section on the RICS website
  • Assessments by MS Teams
  • Free training and CPD
  • Advice for professions to return to work
  • Providing research on Covid-19 (for eg. rethinking city centre living and reopening for businesses)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How has Covid 19 affected the construction industry?

A

Increase on prelims due to requirement for Covid-19

Valuations at home

APC assessments at home

Disputes held online

New clauses in contracts

Contractors more risk adverse to F P L S projects due to unknown on inflation

Meeting held at home

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What does it mention in the latest Modus?

A
Covid-19 no recovery of property market until 2025
RICS response to Covid-19
Working from home
Homeless facilities
Metal wellbeing
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How do you think procurement routes may change due to Covid-19?

A
  • Contract amendments to include risk transfer due to covid 19
  • Contractors may be more risk adverse and opt for 2 stage routes or construction management
  • As contractors are struggling, more simple works may be bid for a low cost due to contractors becoming desperate.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is happening in the industry right now?

A
Investment in infrastructure
Increase in residential builds
New restrictions and rules following covid-19
Brexit tariffs
Material Fluctuations 
Lack of labour
MMC
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the different categories of MMC?

A
  • Category 1: Volumetric 3D box’s.
  • Category 2: Large 2D, panelised systems such as CLT envelope can be as big as 10m a 4m
  • Category 3: 2D small components, pre-cast columns off the shelf such as beams, pre-cast slabs, pre-cast stairs.
  • Category 4: Adaptive manufacture 3D printing.
  • Category 5: Non-structural modern methods, M&E sledges, pre-fabricated bathroom pods and kitchens.
  • Category 6: Material, QR codes and logistic tracking.
  • Category 7: Labour, QR coding and tracking, shows who has completed task and when and when ready for inspection.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Can you tell me about what forms of modern methods of construction you are aware of?

A
Modular construction
Bathroom Pods
3D Printing
Modular grids (internal walls) 
Precast stairs
Utility cupboards
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Whats your view on inflation?

A

MATERIALS

Timber is seeing an increase by 20% due to the demand in China and the US leading to a lack of supply, in turn increasing costs

Scandinavian timber shortage due to a warmer winter

Steel material costs has increased by 35% in some cases, and British Steel has now closed their order books, meaning the supply will be very short in the near future

LABOUR

With the impact of covid / brexit, a lot of overseas labour have returned home, leading to more demand for labour, which has led to a cost increase, especially in London

PRELIMINARIES

BCIS

MACE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the RICS Cost Prediction?

A

New Pro Statement aiming to:

Implement the ICMS
Clear and consistent terminology
Enable the use of digital technologies (BIM)
Recognised importance on the quality of QS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is BIM? and the levels?

A

Building Information Modelling - Process for creating and managing the design / project throughout its lifecycle

BIM L0 - No collaborated 2D
BIM L1 - 3D model
BIM L2 - 3D collaborated
BIM L3 - not yet defined

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the challenges of BIM?

A
Clashes between disciplines
Model not scaled
Comes at a premium
Size of the files
Training
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is in the new Fire Safety Bill?

A

Changes to:
The structure and external walls of the building
Entrance doors to individual flats that open into communal areas
£1bn fund to tackle unsafe cladding

How well did you know this?
1
Not at all
2
3
4
5