CT 125 HMA Flashcards
Using an automatic sampling device, how many pulls (individual samples) should be taken?
4 pulls
How much time should elapse between each pull?
1 to 4 minutes
When sampling from transportation unit, what type of device must be used to obtain material?
An automatic sampling device only.
For a truck with a single bed configuration, how should the sample area be divided?
4 sections of equal length
How far from the edge from the edge of the bed or from the sample borderlines should samples be taken?
At least 1 foot
After the pile has been placed, what final step should the loader operator do before sampling can start?
Backdrag the pile to a height of about 16 inches.
What is the minimum distance from the edge of the pile that samples may be taken?
1 foot
What is the minimum distance from the base material that samples can be taken?
1 inch
What is the minimum length of the sample area?
8 feet
The edge of the sample area should be what minimum distance from either end of the windrow?
3 feet
How much material is removed from the top of the windrow at each sample location?
Approx. 0.5 ft.
How many close to the edge of the mat may HMA samples be taken?
1 foot
How deep into the mat should HMA samples be taken?
Full depth, taking care to exclude the underlying material
What is the procedure from combining collection containers that are half full of HMA?
Blend the material in all four containers together by mixing through a mechanical quatering device two times
How are HMA sample containers filled?
After blending the material, place receptacles from opposite corners into the quartering device, then place 4 sample boxes under the device and split material directly into boxes.
What are acceptable sample containers for HMA?
8x8x4 or 8.5 x 8.5 x 4.5
When sampling rubber, bwc, or OGFC, sample containers should be lined with
Parchment paper or other release liner
When sampling HMA from a plant conveyor system, how much time should elapse between individual pulls?
1 to 4 minutes
When sampling asphalt mixtures from a deposited pile, windrow, or mat behind a paver, material should be shoveled from each quadrant or section directly into its corresponding collection container.
True
When sampling a pile deposited at the plant, do not take material within:
1 ft. of the pile edge or within 1 in. of the base material.
What is the required size of a windrow when sampling from a windrow laid down at the plant?
1 to 2 ft. high, 2 to 5 ft. wide and minimum 14 ft. longl
After marking out the sample area, how much of the top of the HMA windrow should be discarded?
0.5 ft.
When sampling from an HMA silo or batch plant discharge, the bulk sampler system material hopper must be capable of holding the entire drop.
True
At what minimum depth below the material surface should a sample be obtained when sampling HMA from transportation units?
None of the Above