CT 125 HMA Flashcards

1
Q

Using an automatic sampling device, how many pulls (individual samples) should be taken?

A

4 pulls

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How much time should elapse between each pull?

A

1 to 4 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When sampling from transportation unit, what type of device must be used to obtain material?

A

An automatic sampling device only.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

For a truck with a single bed configuration, how should the sample area be divided?

A

4 sections of equal length

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How far from the edge from the edge of the bed or from the sample borderlines should samples be taken?

A

At least 1 foot

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

After the pile has been placed, what final step should the loader operator do before sampling can start?

A

Backdrag the pile to a height of about 16 inches.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the minimum distance from the edge of the pile that samples may be taken?

A

1 foot

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the minimum distance from the base material that samples can be taken?

A

1 inch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the minimum length of the sample area?

A

8 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The edge of the sample area should be what minimum distance from either end of the windrow?

A

3 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How much material is removed from the top of the windrow at each sample location?

A

Approx. 0.5 ft.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How many close to the edge of the mat may HMA samples be taken?

A

1 foot

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How deep into the mat should HMA samples be taken?

A

Full depth, taking care to exclude the underlying material

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the procedure from combining collection containers that are half full of HMA?

A

Blend the material in all four containers together by mixing through a mechanical quatering device two times

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How are HMA sample containers filled?

A

After blending the material, place receptacles from opposite corners into the quartering device, then place 4 sample boxes under the device and split material directly into boxes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are acceptable sample containers for HMA?

A

8x8x4 or 8.5 x 8.5 x 4.5

17
Q

When sampling rubber, bwc, or OGFC, sample containers should be lined with

A

Parchment paper or other release liner

18
Q

When sampling HMA from a plant conveyor system, how much time should elapse between individual pulls?

A

1 to 4 minutes

19
Q

When sampling asphalt mixtures from a deposited pile, windrow, or mat behind a paver, material should be shoveled from each quadrant or section directly into its corresponding collection container.

A

True

20
Q

When sampling a pile deposited at the plant, do not take material within:

A

1 ft. of the pile edge or within 1 in. of the base material.

21
Q

What is the required size of a windrow when sampling from a windrow laid down at the plant?

A

1 to 2 ft. high, 2 to 5 ft. wide and minimum 14 ft. longl

22
Q

After marking out the sample area, how much of the top of the HMA windrow should be discarded?

A

0.5 ft.

23
Q

When sampling from an HMA silo or batch plant discharge, the bulk sampler system material hopper must be capable of holding the entire drop.

A

True

24
Q

At what minimum depth below the material surface should a sample be obtained when sampling HMA from transportation units?

A

None of the Above

25
Q

When sampling a tandem bed transportation unit, split each bed into:

A

2 approx. equal sections to create 4 sections of equal length.

26
Q

When sampling from the mat behind the paver, it is not necessary to obtain the full depth of HMA since the paver creates a representative distribution of material.

A

False

27
Q

When sampling from HMA windrows, the front slope of the sample area should be trimmed and discarded to create a:

A

60 to 90 degree vertical face

28
Q

Which of the following applies when creating one sample set (consisting of 4 sample containers ) of asphalt mixtures?

A

Split the composite sample in a mechanical quartering device to yield enough material to fill 4 sample containers. Place 4 sample containers under the mechanical quartering device so that material will fill each container without overflow.

29
Q
A