Cost estimation and cost calculation Flashcards

1
Q
  1. Give - from the Clients perspective – examples regarding investment costs in connection with a construction project
A
  • Project financing (intrest fees)
  • Project management and administration
  • Design
  • Purchase of site
  • Cost of building
  • Site related costs
  • Equipment, furniture
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. Give - from the Clients perspective – examples regarding annual costs in connection with a construction project
A
  • Capital costs
  • Management costs
  • Running costs
  • Maintenance costs
  • Renewal of equipment
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. Which are the three main types of cost estimations regarding building costs in connection with traditional procurement?
A
  • Pre-tender estimations
  • Bid estimate
  • Detailed construction estimate
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. Give three examples as regards pre-tender estimations
A
  • .
  • .
  • .
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. What is a “conceptual estimate”? Give some example as how it can be expressed!
A

It is based on early concepts about the project. Often rather general proposals. They can be expressed in quantitaive terms:
• A school building- no of students
• A hospital- no of beds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. The reference data that can be used in connection with pre-tender estimates depending on many
    conditions! Name these!
A
  • Type of contractual arrangement/procurement method
  • Location
  • Type of building – number of buildings
  • Size of building
  • Geometry
  • Standard- chosen materials
  • Situatuin on the buildning market
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. Which is the main difference between a direct cost and an indirect cost?
A

Direct costs: can be directly related to a specific part
Indrirect costs: can not be directly related to specific parts- they havet o be divided on different parts according to some principle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Give for a construction project, some examples regarding direct costs and indirect costs

A

Materials Direct cost Indirect costs
Form, reinfrocment Water at site
Labour Work with reinforcment and form Supervision at sight

Other Painting by sub-contractor Sheds,store at site

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. How is the concept operation time defined?
A

”method time”- the real ”productive time related to the applied method
Additional time: such as waiting for materials, visisting toilet also including ”un-normal” interruptions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Name at least six important factors that are affecting the operation time on a construction site!

A
  • Planning and preparation
  • Disturbances
  • Climate
  • Organisation
  • Materials used
  • Equipment
  • Crew
  • Site
  • Learning effect
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  1. Explain the concept “learning effect”?
A

When the same working operation is repeated a reduction in the time-consumption is often registered

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  1. The “learning effect” can be divided into two phases. Which?
A

learning and improvement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  1. How is a “learning effect factor” defined according to Wright?
A

When the number of the produced units doubled, the accumulated average value will be reducedwith specific precentage. If the average value is reduced with p %

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  1. Name some important within construction that affects the “learning effect factor”.
A
  • Type of work/complexity of work
  • Number of operations included
  • Size of time
  • The experience of the team-members
  • The level of planning and preparation of the work