Collapse Operations Flashcards

1
Q

Collapse 7.2

First arriving ENGINE at a building collapse is responsible for?

A

WATER SUPPLY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Collapse 7.1
ENGINE company responsibilities at a BUILDING COLLAPSE are?
5 tasks from HIGHEST to LOWEST

A

HIGHEST to LEAST
1) EXTINGUISH ACTIVE fire in affected building/surrounding debris

2) PROTECT EXPOSURES
3) EXTINGUISH burning VEHICLES within vicinity

4) 2 1/2 hoseline(S) to cover area 3 1/2 to supply 1st TL

(ALL LINES CHARGED)
5)Suspected TERRORIST event 2 1/2 lines located between
2 apparatus or substantial shielding

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Collapse 7.2.1

1st Arriving Engine Officer has 3 other responsibility’s besides water supply and apparatus placement?

A

1) COORDINATE w/ 1st arriving Ladder
2) STRETCH 2 1/2 handline to cover entire site
3) CONSIDER stretching 3 1/2 to TL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Collapse 7.3.1

Who will ensure a 3 1/2 line is stretched to a TL at a building collapse?

A

2nd Arriving ENGINE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Collapse 7.3

Which ENGINE company MAY perform CFR-D duties at a building collapse?

A

2nd Engine MAY perform CFR

3rd Engine and Subsequent PERFORM CFR

1st engine remains together

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Collapse 7.4

Which ENGINE company may assist in the removal of LIGHTLY buried victims?

A

3rd Engine and Subsequent ENGINES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Collapse 7.5.2

Who is responsible in removing LIGHTLY buried victims and DELIVERING them to Casualty Collection Point (CCP)?

A

1st arriving Ladder

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Collapse 7.5.2

First arriving LADDER is responsible for at a Building Collapse is?

A

Reconnaissance

  • scene survey
  • hazard assessment and control
  • remove SURFACE Victims
  • perform PRELIMINARY void search
  • victims should be directed/brought to CCP
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Collapse 7.6

Who is responsible for controlling the GAS,ELECTRIC, and WATER service at a Building Collapse?

A

2nd LADDER

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Collapse 7.6.2

Which company MAY assist in LIFE SAFETY if necessary at a Building Collapse?

A

2nd LADDER may assist

Major priority are the UTILITIES (gas,electric,water,steam)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Collapse

What does 1st n 2nd arriving engines do at a building collapse?

A

1st ENGINE - WATER SUPPLY

2nd ENGINE-ASSIST 1st engine

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Collapse 7.4

Which ENGINE company(s) will be under the direction of the IC at a building collapse?

A

3rd ENGINE and Subsequent Engines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Collapse 4.4

Who will immediately monitor the presence of Radiological/Chemical agents at ALL explosions and MAJOR Collapse?

A

SOC UNITS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Collapse 4.6

EXPLOSIONS shall be viewed as possible DIRTY BOMBS until this is performed?

A

until AIR MONITORING shows the area CLEAR of CONTAMINATION

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Collapse 5.2

STREET management is CRITICAL for first responding units, positioning of rigs shall?

A

OUTSIDE the COLLAPSE ZONE (secondary collapse)

Special equipment,ambulance,different agency etc will be arriving at later times and need there way TO and FROM the scene

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Collapse 5.3.1

Where should the 1st and 2nd ENGINES position themselves at a Building Collapse IF POSSIBLE?

A

OUTSIDE the BLOCK

SEPARATE HYDRANTS on SEPARATE MAINS

17
Q

Collapse 5.3.1

Where should the 3rd n 4th ENGINES position themselves at a Building Collapse?

A

REAR of STRUCTURE
OUTSIDE the BLOCK
SEPARATE HYDRANTS on SEPARATE MAINS

18
Q
Collapse 5.3.2
Which Company(s) SHOULD be used to seal off the ends of the STREET at a Building Collapse?
A

2 ENGINE COMPANYS from 2nd ALARM assignment

19
Q

Collapse 5.4.1

Which Company(s) SHOULD be placed in FRONT of the Collapsed structure?

A

TOWER LADDERS

1st arriving TL should be the ONLY UNIT in front unless there is specific need for additional units

20
Q

Collapse 7.2.1

If 1st arriving ENGINE takes a position within the BLOCK of a Building Collapse what must the ENGINE BOSS ENSURE?

A

Continuous Source of WATER SUPPLY

21
Q

Collapse 8.8

Who can be assigned STREET COORDINATION MANAGER at a Building Collapse?

A

A COMPANY OFFICER

can be either Engine Truck Rescue Squad etc

22
Q

Collapse 8.8

Who coordinates CCP w/ an EMS OFFICER at a Building Collapse?

A

Street Coordination Manager

This is a COMPANY OFFICER

23
Q

Collapse 9.2

What does the acronym LCES stand for at Building Collapse?

A

LCES

L-Lookout

C-Communication

E-Escape Routes

S-Safe Havens

24
Q

Collapse 9.2.1

Lookouts for Building Collapse shall be equipped with

A

HANDHELD Air Horns
and
H/T

25
Q

Collapse 9.2.1

What does 1 LONG BLAST mean from the standard emergency system at a Building Collapse?

A

Cease Operation/All Quiet

1 LONG BLAST/ one word STOP

26
Q

Collapse 9.2.2

What does 1 LONG blast AND 1 SHORT blast mean in the Emergency Signaling system at a Building Collapse?

A

RESUME OPERATION

2 BLAST/Two Words

27
Q

Collapse 9.2

What does 3 SHORT blast mean from emergency signaling system at a Building Collapse?

A

Evacuate the AREA

3 Blast/Three Words

28
Q

Collapse 9.2

Which way would you communicate the EMERGENCY SIGNALING SYSTEM to members operating at a Building Collapse?

A

H/T announcement
then

Apparatus AIR HORN
Or

Handheld AEROSOL can AIR HORN

then again
H/T announcement

29
Q

EMERGENCY SIGNALING SYSTEM!

Cease Operations/All Quiet

Evacuate the Area

Resume Operations
How many BLASTS?
How LONG

A

1 LONG blast (3sec)-STOP

3 SHORT blasts (1 sec EACH)- EVACUATE the AREA

1 LONG and 1 SHORT- RESUME OPERATIONS

30
Q

Collapse

Who may be SPECIALLY called to assist the 2nd Ladder w/ shutting down the UTILITIES?

A

HAZ MAT COMPANY

31
Q

Collapse 10.1.11

Who may operate a CON ED VACUUM TRUCK?

A

TRAINED member of SOC in conjunction w/ CON ED OPERATOR

32
Q

Collapse 11.1

What are the 5 stages of Collapse?

A

Reconnaissance/

Account for and Removal of SURFACE VICTIMS/

Search of VOIDS/

Selected Debris Removal and Tunneling/

General Debris Removal

33
Q

Collapse 11.4

Name the 4 common types of VOIDS?

A

1) V shaped
2) Lean To
3) Individual
4) Pancake

Acronym VPIL

34
Q

Collapse

In which void/collapse is it simpler to LOCATE victims?

A

Pancake Collapse