What is preventive maintenance?
Work that is time or meter-based maintenance performed at the predetermined intervals
What information does the PM module provide that assists with planning?
Assists with planned maintenance work by identifying the labor material service and tool needs.
How and when do PMs generate?
Auto-generated from Maximo CMMS on Saturday. (Manual generation can be used as needed)
How many days in advance will PMs generate?
30 days prior to PM record Next Date or Extended Date if there is one.
If a PMs estimated next due date is in the past will the PM generate?
No
Who can manually generate PMs if needed?
MPS and Admin
Will a PM generate if it is in planner Hold or inactive status?
NO, PM record status must be Active to Generate.
What queries should be run to endure PMs are generating and when should you run them?
In a PM module, there are three quaries that are to run on Mondays.
PM extended date not generated.
PM next date not generated
PMs with no Next or Extended Date
If a PM has an estimate or extended date in the past what correction must be made in order for a PM to generate properly?
Update the Extended Date to reflect a future date. And generate a PM if needed.
What steps need to be taken in order for a PM to auto-generate a purchase request for parts associated with a job plan?
A job plan containing item masters in the material section will create a work order in WMATL status if the “direct issue” box is checked on the JP materials tab.
What is the naming convention for non-factory PMs?
Non-Factory begins with the Campus Designator, the WBS then a 0001 series sequential number
EXAMPLE AN-1252-0001
What is the naming convention for Factory PMs?
Factory, Non-process transfer begind with the factory number
EXAMPLE F17-1254-0001
What should the PM description include?
The default is the core Job Plan description, asset tag. The Job Plan description includes the system and basic scope.
If a PM has more than one frequency should the description include the Job Plan frequency?
No, it should say sequenced
How can you distinguish a PM vs a PM route by looking at the PM number and the PM description?
Shall include the word Route
What is PM lead time and why would you want to use it?
The number of days in advance of the next due date that Maximo generated work orders from this PM. if a part has a 4-week lead time, by adding the PM lead time you can have the PM work order generated.
What field needs to be checked to indicate that there is factory downtime?
Impactive
What does IRN stand for and when would you use it?
Impact Risk Notice - Identifies PMs that could impact factory operations
What field would you use to designate a PM as Regulatory?
PM EHS Compliance - The designation will populate on the PMWO in the WO EHS compliance field.
Can you modify a PM schedule if forecasting dates are locked?
NO
What are four different PM statuses?
Draft, active, inactive, hold