Q
- When the meter is _________, there should be no voltage present on the bottom load-side clips.
A
Removed
2
Q
5.1 _______ meter for cracked glass, loose wiring, and proper voltage rating
A
Inspect
3
Q
5.2 Don appropriate _____ for compartmental equipment.
A
PPE
4
Q
5.3 _______ meter socket for damaged clips, loose screws, and foreign matter.
A
Check
5
Q
5.4 _____ the meter fitting for proper voltage.
A
Test
6
Q
5.5 ________ a meter.
A
Install
7
Q
5.6 Press the ____________ prongs into the line side clips firmly.
A
line side
8
Q
5.7 If possible, _____ the load side for proper voltage.
A
test
9
Q
5.8 _______ the meter ring and seal.
A
Install
10
Q
5.9 ______ the customer’s main, if applicable.
A
Close