Chapter Five Flashcards
The Building Envelope
Jeff’s tenants take issue with their offices being either too cold or too hot. As a result, the building never feels comfortable for its occupants. What factor is impacting the building envelope?
a. wind loads
b. temperate climate
c. water infiltration
d. solar radiation
b. temperate climate
Jerry, a facilities manager, has learned of mold growth on the first floor of the new building he is managing. This may be the result of _____, one of the major reasons for many lawsuits filed in construction defect cases.
Water infiltration
The architectural design committee opted to use ______ during construction, the mostly widely used of all curtain walls, since they like the look of window walls using spandrel panels and mullions.
Metal curtain walls
During their building retrofit project, Sarah’s design team chose _______windows for their strength and durability, relatively low thermal conductance, and reasonable cost.
Vinyl
Conrad explains to his building owners that in order to protect against air and water infiltration, window joint structures are comprised of at least on of the following, except:
a. anchors
b. sealants
c. gaskets
d. weather stripping
A. Anchors
John is planning a building renovation. One valuable technique that will help him explore different design options and HVAC systems i sthe use of a building ______
Simulation
Patricia, a property manager, is meeting with a masonry consultant to survey her building's facad. Most likely, Patricia is complting a(n) \_\_\_\_\_\_\_type of retrofit project: a. metal curtain wall reseal b. HVAC redesign window replacement d. brick facade rehabilitation
d. brick facade rehabilitation
A property or facilities manager should follow the preventive maintenance suggestions of the _____ as part of a n effective program for a building envelope.
Manufacturer of the product installed.