Chapter 1 Flashcards
The owner is not held responsible for obtaining funding for a project.
True or False
False
Which of the following takes stock of what presently exists, determines what is required going forward and then analyses gaps of those elements which must be accomplished? Gap analysis needs assessment program evaluation cost benefit analysis
Needs assessment
Physical feasibility is an analysis of the profile of the property including any possible restrictions with respect to codes and the buildings characteristics.
True or False
True
As program developer, Jim knows that one of the most critical tasks he faces is to put together a multidisciplinary project team whose member have complimentary skill sets, ample experience, passion and enthusiasm for their task, and _______
A strong work ethic.
Miranda relies on both the _____ and the program of requirements to identify the space requirements for a construction project.
Needs assessment.
As an experience developer, Seth is well-versed in_____, which control the use, height, and mass of a building for a given area.
Zoning codes
Karen is interviewing to be the contractor for a _____ project, which can take many forms. She aims to determine if this project will focus on the rehabilitation, modernization or remodeling of the buildings.
Renovation
When designing a project, much time is s[pent developing graphic illustrations of each component of the building These illustrations, known as _______, are included in construction contract documents.
working drawings
Predevelopment studies dedicated to analyzing the suitability of a site’s soil and other aspects of the site itself are focused on:
Physical feasibility
martin is the owner of a new shoe repair store being built in a local strip mall. Which of the following is most important contribution to the construction project?
Obtaining sufficient funding
Obtaining municipal approvals
Supplying the project concept and requirements
Acquiring the land
Obtaining Sufficient funding
Through the green approach to program development, _____helps(s) facilitate consensus and an efficient approval process.
Stakeholder participation