Chapter 3 UREs Flashcards

0
Q
  1. (223) Where does the pylon environmental cooling system acquire its cooling air from during either captive carry or ground testing?
A

A. Aircraft or flight-line units
B. Portable air conditioning units
*C. Aircraft or CCU
D. Civil engineering or supply squadrons

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q
  1. (223) What part of the cruise missile remains with the rack when the arm solenoid is energized?
A

A. Clevis
B. Safing pin
*C. Missile lanyard
D. Turbofan covers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. (224) What type of nuclear weapon system fault could result in the inability to determine if a weapon is in a safe status?
A

A. No-go
*B. Critical
C. Noncritical
D. All clear status

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. (224) When following a troubleshooting procedural flowchart due to a fault message, which step is taken first if a message points towards a component failure?
A

A. Isolate INE and GMFC
*B. Remove W-80 warhead or electrically isolate warheads
C. Remove missile engine and relay assembly
D. Isolate rotary switch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly