Chapter 2 UREs Flashcards
- (211) Which is not an ESTS checkout capability on the B-52H?
A. CSRL empty nuclear bomb check
*B. CSRL loaded nuclear bomb check
C. Loaded pylon check
D. Empty pylon check
- (211) The purpose of the ESTS is to provide the means for
A. training field personnel.
B. tracking missile maintenance.
C. verifying facility related components.
*D. verifying the operational readiness of components undergoing testing.
- (212) What provides an interface between the operator and the ESTS and allows the operator to control and monitor all ESTs operations from a central location?
A. UUT power control rack
*B. CRT display station
C. Air data test set
D. Main rack
- (212) During ESTS software program execution, where is all the test data logged?
A. ADTS memory
*B. Removable disc in the disc drive
C. Fixed disc in the disc drive
D. ESTS memory
- (213) What are the two main parts of the ESTS software system?
*A. UUT test and self-test
B. Automatic test and manual test
C. UUT test and automatic test
D. Self-test and manual test
- (214) The purpose of the 3A5 vacuum pump in ADTS is to
*A. reduce the volume of air contained in the ADTC fixed volume tanks.
B. remove moisture from the air dryers located in the ADTS.
C. depressurize the ADTC fixed volume tanks.
D. purge the ADTC pneumatic paths.
- (215) Which MRATA contains circuits for simulating altitude rate of change for pulsed-type altimeters?
*A. Active loop drawer A1
B. Passive loop drawer A2
C. Power control drawer A5
D. Power supply assembly A3
- (215) What type of power does the A3, A6, and A7 MRATA power supplies produce and what is their purpose?
A. Fixed DC; provides MRATA back-up power
B. Fixed AC; provides MRATA external power
*C. Fixed DC; provides MRATA operating power
D. Fixed AC; provides MRATA alternating current
- (216) How are CCU flowmeter readings accurately taken when measuring air flow?
A. By reading the meter increments vertically
B. By reading the meter increments horizontally
*C. Near the top of the meter float, at the lower edge of the bevel
D. Near the bottom of the meter float, at the lower edge of the bevel
- (217) What provides the majority of the electrical interface connections between the ESTS and the missile?
A. Test adapter group which provides wireless connection
*B. Patchboards which provide hardwire programming
C. Pneumatic hose assemblies via level I/II testing
D. Antenna hood assemblies via missile interface
- (217) What must be in place to prevent RF leakage during missile level I testing procedures?
A. RF lining on rear antenna hood
B. RF lining on both antenna hoods
*C. RF gasket on both antenna hoods
D. RF gasket on forward antenna hood only
- (218) What action is taken to isolate the pitot tube and ERTT heaters from the 28 VDC main bus and prevent them from becoming hot during missile checkout?
A. Install testing cable W8J1 connector inside INE bay
B. Install testing cable W5J1 connector inside engine bay
*C. Remove shorting plug W5J1 from payload bay
D. Remove shorting plug W8J1 from INE bay
- (219) What action is performed as a final step to verify faults have been corrected?
A. Flight load
*B. Level I test
C. Level I restart followed with Level I test
D. Level I selected module with Level I restart
- (219) After the ADCU operational flight software is loaded into the missile, the
A. INE is unclassified.
B. turbofan engine is classified TOP SECRET.
C. engine is classified SECRET.
*D. missile is classified SECRET.
- (220) When troubleshooting electrical systems, what can be used to enhance the process?
A. Paint touch-up jobs
B. Transporting missiles
C. Performing fuel prime tasks
*D. Utilizing cruise missile diagrams