Chapter 3: General Regulations Flashcards
Disposal of sewage, or other liquid wastes, shall be by means of __________
The drainage system of the building or premises
True or false: It shall be unlawful for a person to permit the disposal of sewage or other liquid wastes not properly connected to a drainage system
True
Burred ends of pipe and tubing shall be __________ to the full bore of the pipe or tube
Reamed
Except as otherwise provided in this code, no plumbing system, drainage system, building sewer, private sewage disposal system, or parts thereof, shall be located in __________
Any lot other than the lot that is the site of the building served by such facilities
Piping, fixtures, or equipment that are installed so that they interfere with normal operation and use of windows or doors shall be __________ to avoid interference.
Relocated
All design, construction, and workmanship shall be in accordance with __________
Accepted engineering practices
When supporting horizontal piping 5-inches in diameter with hangers, a __________ inch diameter rod shall be used
1/2”
The building drain from the front building may be extended to the rear building when both buildings are located __________ and no private sewer is available or can be constructed.
On an interior lot
All trenches deeper than the footing of a building or structure, and paralleling the same shall be located not less than __________ from the bottom exterior edge of the footing or as approved
45 degrees
Cast-iron soil pipe, installed vertically, shall be supported at its base and __________ not to exceed __________
Each floor, 15 feet
Threaded or welded 3/4 inch steel pipe supplying water installed horizontally shall be supported at intervals not exceeding __________
10 feet
Piping in the ground shall be laid on
A firm bed
True or false: PEX piping may be coupled together with shielded couplings
False.
(Only cast-iron hubless pipe is coupled with shielded couplings)
The type of acceptable joints for PEX-AL-PEX shall be __________ or __________.
metal insert or metal compression
Copper tubing installed vertically shall be supported at each floor or at intervals not to exceed __________
10 feet