Chapter 14 Flashcards
1
Q
Open Hole Completion
A
Leave the entire drilled reservoir open. Low cost.§
2
Q
Screen or pre-slotted liner completion
A
A wire wrapped screen, or similar is installed. Prevents sand production in wellbore.
3
Q
Cemented and perforated casing.
A
Install a cemented casing string. perforated allows paths for fluid to flow from and to wellbore.