Chapter 13 Flashcards
advisable method of addressing safety hazards such as blind curves and intersections on a water shuttle route
Have police officers or fire police control traffic at these points.
Successful water shuttle operations are BEST achieved by
using efficient filling and dumping operations
The Insurance Services Office (ISO) formula uses _____ of a tender’s total tank capacity to account for water lost or undischarged and remaining in the tank after the dump valve is closed.
90 percent
most hazardous tasks for the driver/operator during water shuttle operations
Driving the travel route
using large diameter hose during a fill operation
It may actually provide little advantage
A water shuttle operation must be integrated into the Incident Command structure, which should adhere to
the National Incident Management System
How is the gpm (L/min) data for a water tender MOST likely to be used during preplanning
To determine how many tenders are required to provide a particular flow for a given target hazard
Which of the following statements about shutting down the dump site is MOST accurate?
Portable water tanks should be drained of any sediment, debris, or nonpotable water and placed back on the apparatus
On water tenders, remote controlled vents are preferable to manually operated vents because
manually operated vents may require the driver/operator to climb on top of the tank
In accordance with NFPA® 1901, water tenders must be designed to be filled at a rate of at least
1,000 gpm
Commonly, water tenders have at least _____ 2½ inch (65 mm) direct tank fill connection(s) or one LDH direct tank fill connection on the rear of the apparatus.
two
exemplifies a problem that steep grades can cause during a water shuttle operation
Uphill grades slow the operation down, and downhill grades require constant attention to control the vehicle
may increase the options available for using static water supply at many incidents
Portable pumps
After the onboard water tank is full, what is the next step in the fill operation?
The fill site personnel should slowly close the valve(s) on the gate or manifold.
At the fill site, _____ firefighter(s) should be assigned to maneuver and connect each fill line that is laid out
1
explains why departments should predetermine the most advantageous sites and routes for water shuttle operations during preincident planning
The IC or Water Supply Group Supervisor will be able to establish a reliable water supply more quickly during an incident.
During large-scale incidents, it may be necessary to establish two or more water shuttle operations under the immediate coordination of a (an)
Water Supply Branch Manager.
What is the primary advantage of using a nurse tanker (tender) during dump site operations
Capacity of its tank
dump site location to allow continual forward movement?
A large, nearby parking lot
identifies when an overhead pipe should be used during water tender top-fill procedures
When there is no other way of filling through the top opening
maintains certain criteria for determining the proper specifications for water tender apparatus
Each individual jurisdiction
What is the goal of a portable multi-tank operation
Keep the tank from which the attack pumper is drafting full at all times
What should the dump site pumper do to ensure that prime is not lost when other discharges are shut down
Flow a small waste line back into the tank
an advantage provided by vacuum tenders
A vacuum tender can self-fill from a static water source at a rate of up to 2,000 gpm