Chapter 1 UREs Flashcards

0
Q
  1. (401) What feature(s) of the before ICBM security modernization program [BISMP] will no longer be found in the after ICBM security modernization program [AISMP] security pit control station?
A

*A. Secondary door raise, lower, off switch and an access shaft light switch
B. Secondary door raise only switch and a junction box (J-box) assembly
C. Secondary door raise only switch and an access shaft light switch
D. Secondary door raise only switch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q
  1. (401) Opening the primary door is only possible if the
A

A. switch in the security pit is set to lower.
B. hand driven linear actuator (HDLA) is operational.
*C. vault door is removed and the lock bolt is retracted.
D. site activation remote controller (SARC) is connected.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. (401) What [BISMP] secondary door top operation would not be normally performed by a technician on a [AISMP] secondary door top?
A

*A. Manually retracting the locking bolts.
B. Performing a manual T-handle check.
C. Manually dialing the combination locks.
D. Installing an emergency drive shaft rod for secondary door drill down.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. (401) What must first be verified before the secondary door can be secured?
A

*A. Both combination locks are operational.
B. Only one combination lock need be operational, but both are installed.
C. Both combination locks can be unlocked by the team chief and the team member.
D. Only one combination lock needs to be operational when it unlocks on the first try.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. (401) Upon entering the security pin retraction window of time, the site activation remote controller (SARC) commanded operations that must occur to lower the secondary door include retracting the
A

A. combination lock bolt and actuator locking bar.
B. cam locking bar and combination lock bolt.
C. locking bolts and combination lock bolt.
*D. actuator locking bar and locking bolts.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. (401) What missile support base (MSB) maintained equipment item is required to penetrate an [AISMP] LF but not a [BISMP]?
A

A. Security pin assembly
*B. Site activation remote controller (SARC)
C. Secondary door control assembly (SDCA)
D. AC backup generator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. (401) Entering the electromechanical actuator (EMA) system into enhanced maintenance mode is achieved by setting the mode switch on the
A

A. secondary door control assembly (SDCA) to maintenance only.
*B. SDCA to maintenance and the EMA gearbox safety pin is engaged.
C. site activation remote controller (SARC) to enhanced maintenance only.
D. SARC to enhanced maintenance and the EMA gearbox safety pin is engaged.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. (401) Which secondary door control assembly (SDCA) panel houses timer circuits that provide control of the site penetration delay timer and security pin retraction timer?
A

A. Swing-out
B. Front
*C. Back
D. Side

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  1. (401) At a [BISMP] LF, it is important to switch the secondary control switch in the security pit control station to OFF before entering the LER because the
A

A. electromechanical linear actuator (EMLA) would continue operating, possibly damaging equipment.
B. EMLA selector switch would only be able to reverse the motion of the secondary door.
C. secondary door could raise if a limit switch was tripped.
*D. EMLA selector switch would be ineffective.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. (402) Which major EMA system component is partially charged by the lowering of the secondary door and supplements LF commercial power to raise the secondary door?
A

A. Motor drive cabinet (MDC)
*B. Energy storage system (ESS)
C. Flywheel power system (FPS)
D. Secondary door controller assembly (SDCA)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  1. (402) Which major EMA system component may use commercial or auxiliary power to run the EMA?
A

A. Secondary door controller assembly (SDCA)
B. Flywheel power system (FPS)
C. Energy storage system (ESS)
*D. Motor drive cabinet (MDC)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  1. (403) The hydraulic ram assists with opening the launcher closure (LC) door by
A

*A. forcing the lock pin down.
B. driving the lock cam down.
C. rolling the LC door open only.
D. rolling the LC door closed only.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  1. (403) The purpose for marking reference points along the launcher closure (LC) rail is to
A

*A. see if the door is actually moving.
B. allow technicians enough room to safely install the LC barrier set.
C. stop the LC door at certain points to prevent the door from gaining momentum and free-rolling.
D. permit recovery strap installation to the cable pin underneath the LC door to stop it at certain points.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  1. (403) During LF forced entry, an EMT team begins repair actions on a faulty combination lock assembly after the
A

A. secondary door has been lowered.
B. launcher closure (LC) door is secured.
*C. safety control switch (SCS) is installed.
D. SCS is installed and the launcher equipment room penetration procedures have been completed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  1. (404) What would be reported at the LCC if there was an attempt to unlock the security pit vault door?
A

A. Penetration detector alarm
B. Transducer alarm
C. Outer zone alarm
*D. Inner zone alarm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  1. (404) What wing 1 LF security system feature does not exist at a wing 3 or wing 5 LF?
A

A. Inner zone (IZ) radar
*B. Outer zone (OZ) switch loops
C. Launcher closure (LC) penetration detector
D. Launch support building (LSB) vibration transducer