Ch.12 Flashcards

1
Q

Attack pumpers equipped with an adjustable intake relief valve should be set between _____ and ____ psi to establish a stable operating condition ?

A

50 and 75 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Drivers should refer to ______ for further information regarding the placement of relief devices?

A

NFPA 1962

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Driver /operators should not attemp to correct minor fluctuations as long as the intake pressure does not drop below _____ psi?

A

20 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Using two or more pumpers to move water over a long distance by operating them in series ?

A

Relay operation (also known as relay pumping)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Process of releasing a liquid or gas under pressure?

A

Bleed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Centrifugal pumps are rated to pump their maximum volume capacity at ____ psi at draft?

A

150 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Pulping apparatus located at the fire scene that receives water from the relay and is responsible for supplying the attack lines and appliances required for fire suppression ?

A

Fire attack pumper

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Hose tenders can carry a _____ or more of LDH ?

A

mile

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Basically the need for _______________ is determined by the amount of water required at an incident and the distance between the incident scene and the water source ?

A

Relay pumping

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Increasing flow during a relay operation may be accomplished by placing additional ________ in the system?

A

Pumpers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

A relay pumping operation begins with the _________ capacity pumper working from the water source ?

A

Largest

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

All personnel involved in the relay operation must understand that the overall capacity of the system is determined by the ___________ and the ____________ diameter of hose used in the relay?

A

Smallest pump
Smallest diameter hose

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Apparatus equipped with pressure governors should be set in the ________ mode when acting as the attack pumper and in _____ mode while working as a relay pumper?

A

Pressure mode
Rpm mode

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

This method consists of deploying portable folding drop tanks at each intake for pumpers in the relay operation?

A

Open relay method

How well did you know this?
1
Not at all
2
3
4
5
Perfectly