Population of Seoul
23 million
When was the river concreted over?
1970s
What was built over the river in the 1970s?
A six lane high way
How long and wide is the ‘green corridor’ that was constructed?
8km long and 730 m wide
How many cars used the high way per day?
160,000
By how much did temperatures drop in the river after the restoration?
2 - 3 degrees
How much did the project cost?
$281 million
How long did it take to finish?
2 years
What was done to provide transport to the people who used to use the highway?
A bus transit service ran along the river, and an underground subway train was built.
Footpaths also made walking an option
What percentage of materials from the old highway were reused to construct the park?
75%