Capt Procedural flows & Callouts Flashcards
After start
1) Check EICAS & INFO
2) Verify WDR and aircraft configuration (flaps, anti-ice, etc…)
3) Call for “AFTER START CHECKLIST”
After completion of the push
**Tug Driver calls “set brakes“
1) PARK BRAKE - ON (Verify status message)
2) Call back “Brakes set, clear to disconnect“
3) Receive and return salute (verifying area all clear)
4) Call “salute received, flap ____” and wait for FO reply
5) NOSE STEER switchlight - Push (verify extinguished NOSE STEER OFF status message)
verify after start and WDR procedures
after flap lever positioned
6) Call for Taxi
Taxi
Lights
1) Rudder check (Can be completed on the taxi)
2) call for “TAXI CHECKLIST”
Delayed engine start
If doing a single engine taxi, insure start of the number one engine with sufficient time for engine warm up
1) Call for engine start
2) call for “DELAYED AFTER START CHECKLIST”
Approaching departure runway 
-Call “Autothrottles”
-Verify completion and call “Thrust armed”
-Call for “Before Takeoff Check”