Capacity Planning Flashcards

1
Q

It is the upper limit or ceiling on the load that an operating unit can handle.

A

Capacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

(Design/Actual) capacity is the maximum obtainable output

A

Design Capacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

(Design/Effective) capacity is the maximum capacity given product mix, scheduling difficulties, and other doses of reality. Design capacity minus allowances such as personal time and maintenance.

A

Effective Capacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

rate of output actually achieved–cannot exceed effective capacity.

A

Actual Output

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Capacity and location are closely tied

(Need to be near consumers, Inability to store services, Degree of volatility of demand)

A

Need to be near consumers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Capacity must me matched with timing of demand

(Need to be near consumers, Inability to store services, Degree of volatility of demand)

A

Inability to store services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Peak demand periods

(Need to be near consumers, Inability to store services, Degree of volatility of demand)

A

Degree of volatility of demand

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

To achieve a match between the long-term
supply capabilities of an organization and the
predicted level of long-term demand

A

Goal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

______capacity -> operating costs that are too high
______capacity -> strained resources and possible
loss of customers

A

Overcapacity, undercapacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Capacity Strategies:

Build capacity in anticipation of future demand
increases (Leading/Following/Tracking)

A

Leading

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Capacity Strategies:

Build capacity when demand exceeds current capacity. (Leading/Following/Tracking)

A

Following

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Similar to the following strategy, but adds capacity in
relatively small increments to keep pace with increasing
demand. (Leading/Following/Tracking)

A

Tracking

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Extra capacity used to offset demand
uncertainty

A

Capacity cushion

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Organizations that have greater demand
uncertainty typically have ______ capacity cushion.

A

greater

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Organizations that have standard products and
services generally have ______ capacity cushion

A

smaller

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Forecasting Capacity Requirements:

Long-term considerations relate to _______
level of capacity requirements

A

overall

17
Q

Forecasting Capacity Requirements:

Short-term considerations relate to probable
v_______ in capacity requirements

Less concerned with c_____ and t_____ than
with seasonal variations and other variations
from average

A

variations

cycles and trends

18
Q

___________ Operation is an operation in a
sequence of operations whose capacity is lower
than that of the other operations.

A

Bottleneck

19
Q

If output rate is less than the optimal level,
increasing the output rate results in decreasing
average per unit costs (Economies/Diseconomies of scale)

A

Economies of scale

20
Q

If the output rate is more than the optimal
level, increasing the output rate results in
increasing average per unit costs (Economies/Diseconomies of scale)

A

Diseconomies of scale

21
Q

Reasons for economies of scale:
 (Variable/Fixed) costs are spread over a larger number of units
 (Processing/Construction) costs increase at a decreasing rate as facility size increases
 (Processing/Construction) costs decrease due to standardization

A

Fixed
Construction
Processing

22
Q

Reasons for diseconomies of scale
 Distribution costs (decrease/increase) due to traffic congestion and shipping from a centralized facility rather than multiple smaller facilities
 Complexity (decreases/increases) costs
 Inflexibility can be an issue
 Additional levels of bureaucracy

A

increase
increases

23
Q

Something that limits the performance of a process or
system in achieving its goals

A

Constraint

24
Q

Focuses on the relationship between cost,
revenue, and volume of output

A

Cost-Volume Analysis

25
Q

The volume of output at which total cost and
total revenue are equal

A

Break-even point

26
Q

Cost-volume analysis is a viable tool for
comparing capacity alternatives if certain
assumptions are satisfied:

  • One product is involved
  • Everything produced can be sold
  • The variable cost per unit is (varying/the same) regardless of volume
  • Fixed costs (do/not) change with volume changes, or they are step changes
  • The revenue per unit is (different/the same) regardless of volume
  • Revenue per unit exceeds variable cost per unit
A

the same
do not
the same

27
Q

The difference between cash received from
sales and other sources, and cash outflow for
labor, material, overhead, and taxes

A

Cash Flow

28
Q

The sum, in current value, of all future cash
flow of an investment proposal

A

Present Value

29
Q

________ management is one way by which organizations can enhance their effective capacities

A

Bottleneck

30
Q

________ reduces the organization’s dependence on forecast accuracy and reliability.

Many organizations utilize _______ ________ to achieve flexibility

A

Flexibility

Capacity Cushions